Thefollowinginstructions areissued duringthe construction ofabuilding project: The architect issues a variation instruction to increase ten pile cap sizes ofconcretegrade30from1000mm(L)x 1200mm(B)x1000mm(H)to1200mm(L)x 1500mm(B) x 1000mm(H). The rate
Thefollowinginstructions areissued duringthe construction ofabuilding project:
The architect issues a variation instruction to increase ten pile cap sizes ofconcretegrade30from1000mm(L)x 1200mm(B)x1000mm(H)to1200mm(L)x 1500mm(B) x 1000mm(H). The rate for concrete grade 30 in the Schedule ofrates(SOR)is $160/m3.
Explaintheruleforthevaluationofthisvariation.Calculatethecostofsuch variationwork.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started