Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Theory of Constraints, Internal Constraints Pratt Company produces two replacement parts for a popular line of Blu-ray disc players: Part A and Part B. Part

image text in transcribed
image text in transcribed
image text in transcribed
image text in transcribed
image text in transcribed
Theory of Constraints, Internal Constraints Pratt Company produces two replacement parts for a popular line of Blu-ray disc players: Part A and Part B. Part A is made up of two components, one manufactured internally and one purchased from external suppliers. Part B is made up of three components, one manufactured internally and two purchased from suppliers. The company has two processes: fabrication and assembly. In fabrication, the internally produced components are made. Each component takes 20 minutes to produce. In assembly, it takes 30 minutes to assemble the components for Part A and 40 minutes to assemble the components for Part B. Pratt Company operates one shift per day. Each process employs 100 workers who each work eight hours per day. Part A earns a unit contribution margin of $20, and Part B earns a unit contribution margin of $24 (calculated as the difference between revenue and the cost of materials and energy). Pratt can sell all that it produces of either part. There are no other constraints. Pratt can add a second shift of either process. Although a second shift would work eight hours, there is no mandate that it employ the same number of workers. The labor cost per hour for fabrication is $15, and the labor cost per hour for assembly is $12. Required: 1. Identify the constraints facing Pratt, and select the the di appropriately graphs the constraints. (Units are in hundreds) a. 25 20 15 - B 10 5 0 2 4 6 8 10 12 14 16 18 20 22 24 c. 25 20 B 15 10 5 0 T T T 0 8 8 10 12 14 16 18 20 22 24 b. 25 20 15 1 B 10 5 O 02 4 6 8 10 12 14 16 18 20 22 24 d. 25 20 - B 15 10 - 5 A 0 00 10 12 14 16 18 20 22 24 Correct answer is How many binding constraints are possible? What is Pratt's optimal product mix? (If a product should not be produced at all, enter "0" as your answer.) Part A units Part 8 units What daily contribution margin is produced by this mix? 2. What is the drummer constraint? How much excess capacity does the other constraint have? Assume that a 1.5-day buffer inventory is needed to deal with any production interruptions. Round your answer to two decimal places. hours 3. Why the use of local labor efficiency measures will not work in Pratt's TOC environment 4. Suppose Pratt decides to elevate the binding constraint by adding a second shift of 50 workers (labor rates are the same as those of the first shift). Would elevation of Pratt's binding constraint improve its system performance? Theory of Constraints, Internal Constraints Pratt Company produces two replacement parts for a popular line of Blu-ray disc players: Part A and Part B. Part A is made up of two components, one manufactured internally and one purchased from external suppliers. Part B is made up of three components, one manufactured internally and two purchased from suppliers. The company has two processes: fabrication and assembly. In fabrication, the internally produced components are made. Each component takes 20 minutes to produce. In assembly, it takes 30 minutes to assemble the components for Part A and 40 minutes to assemble the components for Part B. Pratt Company operates one shift per day. Each process employs 100 workers who each work eight hours per day. Part A earns a unit contribution margin of $20, and Part B earns a unit contribution margin of $24 (calculated as the difference between revenue and the cost of materials and energy). Pratt can sell all that it produces of either part. There are no other constraints. Pratt can add a second shift of either process. Although a second shift would work eight hours, there is no mandate that it employ the same number of workers. The labor cost per hour for fabrication is $15, and the labor cost per hour for assembly is $12. Required: 1. Identify the constraints facing Pratt, and select the the di appropriately graphs the constraints. (Units are in hundreds) a. 25 20 15 - B 10 5 0 2 4 6 8 10 12 14 16 18 20 22 24 c. 25 20 B 15 10 5 0 T T T 0 8 8 10 12 14 16 18 20 22 24 b. 25 20 15 1 B 10 5 O 02 4 6 8 10 12 14 16 18 20 22 24 d. 25 20 - B 15 10 - 5 A 0 00 10 12 14 16 18 20 22 24 Correct answer is How many binding constraints are possible? What is Pratt's optimal product mix? (If a product should not be produced at all, enter "0" as your answer.) Part A units Part 8 units What daily contribution margin is produced by this mix? 2. What is the drummer constraint? How much excess capacity does the other constraint have? Assume that a 1.5-day buffer inventory is needed to deal with any production interruptions. Round your answer to two decimal places. hours 3. Why the use of local labor efficiency measures will not work in Pratt's TOC environment 4. Suppose Pratt decides to elevate the binding constraint by adding a second shift of 50 workers (labor rates are the same as those of the first shift). Would elevation of Pratt's binding constraint improve its system performance

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Financial Management Principles And Practices

Authors: Sudhindra Bhat

2nd Edition

8174465863, 978-8174465863

More Books

Students also viewed these Finance questions