There are six jobs in line for processing. It is time zero at this moment and all jobs are ready to begin. There is only
There are six jobs in line for processing. It is time zero at this moment and all jobs are ready to begin. There is only one operation remaining. All jobs arrived at the same time, and FCFS begins with job A, then B, C, D, E, and F. Following the FCFS rule, what is the average flow time? Job Processing Time Due Date A 5 12 B 7 18 C 8 6 D 3 10 E 9 22 F 12 17 Group of answer choices 22.7 11.8 133 32.8 35