Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

There is a die-cutting machine for metal parts, which presented a failure when the power was cut off at the plant, The program in the

There is a die-cutting machine for metal parts, which presented a failure when the power was cut off at the plant, The program in the PLC was completely erased and you are in charge of reprogramming the PLC to carry out the assigned task. Below are the steps of the die-cutter process.

1. Detection of metal part in position.
2. Once the part is detected, the clamps are activated.
3. It has manual operation buttons by the operator with both left and right hands to avoid accidents. (2 buttons).
4. When the buttons are activated, the die-cutter is activated.
5. After making the stamping/cut, the clamps are released and 2 seconds later they activate the plunger of the piece to drop it out the machine.
6. Remember that there must be a button to energize the machine and another total stop.

Please do a simple ladder diagram for this problem, if you can simulate it to see how it works it would be nice or at least explain how it works. Thanks in regards.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Design Operation And Evaluation Of Mobile Communications

Authors: Gavriel Salvendy ,June Wei

1st Edition

3030770249, 978-3030770242

More Books

Students also viewed these Programming questions

Question

5. How is Mr. Bonner encouraging Marcuss self-efficacy?

Answered: 1 week ago