There is no missing information this is literally all there is INSTRUCTIONSComplete Exercise 4 (pg 197)Ensure the entire network fits across a single page. Remember,

There is no missing information this is literally all there is

INSTRUCTIONSComplete Exercise 4 (pg 197)Ensure the entire network fits across a single page. Remember, arrows should flow from left to right to establish predecessor successor relationships.

Part a: 4. Draw a project network from the following information. What activity(ies) is a burst activity? What activity(ies) is a merge activity? ID Description. Predecessor A. Contract signed. None B

Part a: 4. Draw a project network from the following information. What activity(ies) is a burst activity? What activity(ies) is a merge activity? ID Description. Predecessor A. Contract signed. None B. survey designed A C. Target market identified. A D. Data collection. B,c E. Develop presentation. B F. Analyze results. D G. Demographic. C H Presentation. E, F, G

INSTRUCTIONS: Complete Exercise 7 (pg 198)Ensure the entire network fits across a single page. Part B: The project information for the custom order project of the Air Control Company is presented here. Draw a project network for this project. Compute the early and late activity times and slack times. Identify the critical path. ID. Description. Predecessor. Time A. Order review. None 2 B. Order standard parts. A 3 C. Produce standard parts. A 10 D. Design custom parts. A. 13 E. Software development. A 18 F. Manufacture custom hardware. C,D 15 G. Assemble. B,F 10 H. Test. E,G 5

Part C: INSTRUCTIONS: Draw the AON network for Exercise 10 (pg ASSIGNMENT 199). Complete the forward and backward passes, calculate total slack for each activity, identify the critical path, and identify the total project length (or how long it will take to complete the project) based on days. K. Nelson, project manager of Print Software, Inc., wants you to make a project network; compute the early, late, and slack activity times; determine the planned project duration; and identify the critical path. His assistant has collected the following information for the color printer drivers software project: ID Description. Predecessor. Time A. External specifications. None. 8 B. Review design features. A 2 C. Document new features. A 3 D. Write software. A 60 E. Program and test. B 40 F. Edit and publish notes. C 2 G. Review manual. D 2 H. Alpha site. E, F 20 I. Print manual. G 10 J. Beta site. H,| 10 K. Manufacture. J. 12 L. Release and ship. K 3

image text in transcribedimage text in transcribedimage text in transcribed prod.reader-ui.prod.mheducation.com C MEWORK #2: AON Network - PMT110-N880: Intro to Project Mgmt -.. Class PMT 110-N802-SU-2022 in Connect M Exercises E 109 of 500 > Aa 10. K. Nelson, project manager of Print Software, Inc., wants you to prepare a project network; compute the early, late, and slack Page 199 activity times; determine the planned project duration; and identify the critical path. His assistant has collected the following information for the color printer drivers software project: ID Description Predecessor Time A External specifications None 8 B Review design features N C Document new features A w D Write software A 60 E Program and test 40 Edit and publish notes 2 G 2 Review manual D H Alpha site E, F 20 G 10 Print manual 10 Beta site H, I 12 K Manufacture J K 3 Release and ship 11. A large Southeast city is requesting federal funding for a park-and-ride project.* One of the requirements in the request application is a network plan for the design phase of the project. Sophie Kim, the chief engineer, wants you to develop a project network plan to meet this requirement. She has gathered the activity time estimates and their dependencies shown here. Show your project network with the activity MacBook Pro Q @ O O 2 3 5 6 Y O P T U M Q W E R J K A S D F G H .V M Z X C V B Nrod.mheducation.com C TOMEWORK #2: AON Network - PMT110-N880: Intro to Project Mgmt -... Class PMT 110-N802-SU-2022 in Connect M Exercises 109 of 500 > Aa Install power lines B D Install drainage B Pour foundation C, D w 7. The project information for the custom order project of the Air Control Company is presented here. Draw a project network Page 198 for this project. Compute the early and late activity times and slack times. Identify the critical path. ID Description Predecessor Time A Order review None 2 B Order standard parts A 3 C Produce standard parts A 10 D Design custom parts A 13 E Software development A. 18 F Manufacture custom hardware C, D 15 G Assemble B, F 10 H Test E, G 8. You have signed a contract to build a garage for the Simpsons. You will receive a $500 bonus for completing the project within 17 working days. The contract also contains a penalty clause in which you will lose $100 for each day the project takes longer than 17 working days. Draw a project network, given the following information. Complete the forward and backward pass, compute activity slack, and identify the critical path. Do you expect to receive a bonus or a penalty on this project? MacBook Pro Q @ D o 2 A 5 6 O Q W E R T Y U O P A S D F G H K Z X C V B N M 98 Tprod.reader-ui.prod.mheducation.com M6 HOMEWORK #3: AON Network, Passes, Slack and Critical Path - PMT110.. Class PMT 110-N802-SU-2022 in Connect M Exercises E 109 of 500 ) Aa F References C G Proof paper D, E, F H Submit paper G 4. Draw a project network from the following information. What activity(ies) is a burst activity? What activity(ies) is a merge activity? ID Description Predecessor A Contract signed None B Survey designed A C Target market identified A D Data collection B, C E Develop presentation B Analyze results D Demographics C Q H Presentation E, F. G 5. Draw a project network from the following information. What activity(ies) is a burst activity? What activity(ies) is a merge activity? ID Description Predecessor A Order review None Order MacBook Pro Q $ W # A N 6 8 O P Q W E R T Y U O A S D F G H K S. ..

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Fundamentals Of Management

Authors: Ricky Griffin

10th Edition

0357517342, 978-0357517345

Students also viewed these General Management questions

Question

Be prepared to discuss your career plans.

Answered: 1 week ago