Question
This problem studies scheduling anomalies. Consider the task precedence graph depicted in Figure below with eight tasks. In the figure, ei denotes the execution time
This problem studies scheduling anomalies. Consider the task precedence graph depicted in Figure below with eight tasks. In the figure, ei denotes the execution time of task i. Assume task i has higher priority than task j if i
(a) Consider scheduling these tasks on two processors. Draw the schedule for these tasks and report the makespan.
(b) Now consider scheduling these tasks on three processors. Draw the schedule for these tasks and report the makespan. Is the makespan bigger or smaller than that in part (a) above?
(c) Now consider the case when the execution time of each task is reduced by 1 time unit. Consider scheduling these tasks on two processors. Draw the schedule for these tasks and report the makespan. Is the makespan bigger or smaller than that in part (a) above?
e= 1 e,= 2(2 7 e 23 4 6 e= 1 e,= 2(2 7 e 23 4 6
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started