Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

This project is in continuation from project 1. Task 1.1 In this task: The student will act as Kelly The assessor and other students act

This project is in continuation from project 1.

Task 1.1

In this task:

  • The student will act as Kelly
  • The assessor and other students act at team members
  • The student must prepare the designs and explain the technical terminology used

In preparation for the commencement of the project, the student will need to prepare and document the following for the team:

Once this has been completed, Kelly will need to hold a team meeting on the proposed commencement date of the project to explain the following as the part project design.

1. How network can be segmented

2. How the network traffic can be managed

3. What the basic requirements are to install the switches

As you are acting as Kelly, you must complete the minutes of meeting template given below :

Task 1.2

This task is in continuation of task 1.1

In this task:

  • The student will act as Kelly
  • The student must perform the initial configurations on the switch
  • Student must identify and document the basic requirements to install the network switch

Part A

After the meeting, it is time for Kelly and the team to jump into action. As a first step, Kelly needs to perform the initial configurations of the switch according to organisational requirements. Eastwood Secondary also wants Kelly to document the configurations for their reference.

You are acting as Kelly and need to document the steps you will use to carry out the following activities for the initial switch configuration:

Reset the switch to factory defaults

Set IP address

Set interface description

Clear MAC address table

Add static MAC address in CAM table

Save the running configurations

Backup configuration settings to the server

Upgrade the firmware

Once you have completed the documentation, you need to organise a time with your trainer/assessor and show them how you can execute the initial configuration of a switch. Your assessor will provide a network switch with a speed of 10/100gbps to check your skills.

Part B

After performing the initial configurations on the network switch, Kelly needs to prepare a list of appropriate media, cables and ports required to connect the switch to other network devices. Using the template below, write down the requirements you will need.

Please see below link for project 1 .

https://www.chegg.com/homework-help/questions-and-answers/eastwood-secondary-school-committed-providing-students-education-need-succeed-today-s-digi-q126957716?recommendationId=bc0ae80e-0137-4548-9e64-b1a8e7213e79ionName=recent%20activityionId=7d97b82b-9f55-4694-8425-8cfbb9c2af04

image text in transcribed

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

The Manga Guide To Databases

Authors: Mana Takahashi, Shoko Azuma, Co Ltd Trend

1st Edition

1593271905, 978-1593271909

More Books

Students also viewed these Databases questions