Three minor repairs were made at a total cost (labor, materials, and overhead) of $110. It has been predetermined that each repair job required 130
Three minor repairs were made at a total cost (labor, materials, and overhead) of $110. It has been predetermined that each repair job required 130 man minutes of preparation and clean up.
Job Time Required Employees Required
A 50 min 3
B 100 Min 5
C 30 min 2
What is the cost of Job B?
Step by Step Solution
There are 3 Steps involved in it
Step: 1