Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Three sites (A, B & C) are being considered for flood control dams. The three construction costs are $10 million, $12 million and $20 million;
Three sites (A, B & C) are being considered for flood control dams. The three construction costs are $10 million, $12 million and $20 million; and the annual maintenance costs are expected to be $15,000, $20,000 and $23,000 respectively for sites A, B and C. In addition, a $75,000 refurbishing expenditure will be required every 10 years at each site. Every year without the dams, $2 million in flood damage occurs. It is projected that dam A, by itself, would reduce the annual damage to $1.6 million. Similarly, Dam B would reduce the damage to $1.2 million, and Dam C to $0.77 million. Since the dams would be built on different branches of a large river, any one or all of the dams could be constructed, and the flood damage reductions would be additive. The planning interest rate is 5% per year, and the dams would be considered permanent. One dam is to be constructed converting the all quantities to annual worth values do incremental standard benefit/cost analysis to choose the best damn. Three sites (A, B & C) are being considered for flood control dams. The three construction costs are $10 million, $12 million and $20 million; and the annual maintenance costs are expected to be $15,000, $20,000 and $23,000 respectively for sites A, B and C. In addition, a $75,000 refurbishing expenditure will be required every 10 years at each site. Every year without the dams, $2 million in flood damage occurs. It is projected that dam A, by itself, would reduce the annual damage to $1.6 million. Similarly, Dam B would reduce the damage to $1.2 million, and Dam C to $0.77 million. Since the dams would be built on different branches of a large river, any one or all of the dams could be constructed, and the flood damage reductions would be additive. The planning interest rate is 5% per year, and the dams would be considered permanent. One dam is to be constructed converting the all quantities to annual worth values do incremental standard benefit/cost analysis to choose the best damn
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started