Question

1 Approved Answer

Tina's Material Company hauls gravel to a construction site, using a small truck and a large truck. The carrying capacity and operating cost per load

image text in transcribed
Tina's Material Company hauls gravel to a construction site, using a small truck and a large truck. The carrying capacity and operating cost per load are given in the accompanying table. Tina must deliver a minimum of 140 cubic yards per day to satisfy his contract with the builder. The union contract with his drivers requires that the total number of loads per day is a minimum of 9. How many loads should be made in each truck per day to minimize the total cost? Small Truck Large Truck Capacity (yd' ) 20 70 Cost per Load $69 $65 In order to minimize the total cost, the number of loads in a small truck that should be made is and the number of loads in a large truck that should be made is

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Contemporary Engineering Economics

Authors: Chan S. Park

5th edition

136118488, 978-8120342095, 8120342097, 978-0136118480

More Books

Students also viewed these Mathematics questions

Question

Differentiate the function. r(z) = 2-8 - 21/2 r'(z) =

Answered: 1 week ago