To calculate the cost pool activity rate, the overhead costs assigned to the pool are divided by the _________. a.) predetermined overhead allocation rate b.)
To calculate the cost pool activity rate, the overhead costs assigned to the pool are divided by the _________. a.) predetermined overhead allocation rate b.) actual activity level c.) expected activity level d.) activity driver