17 / 71 75% je Cemetery monuments are cut, polished and engraved in a variety of standard shapes, sizes, and patterns and sold to funeral homes. Architectural granite slabs are special ordered by contractors for office buildings. These slabs are cut and polished to exacting specifications. The small pieces of gratite resulting from the cutting process are crushed and sold to farm-supply outlets as poultry Scorpion City has provided the following costs and output information: Process Tons of Outpat Quarry $350.000 100,000 Cutting I 250,000 90,000 300,000 25,000 Cost Monuments Granite slabs 400.000 60,000 Grit 10.000 5,000 Quarry and Cutting are joint processes. A local farm-supply distributor purchases all of the grit that is produced at $40 per ton Assume that Scorpion City uses the physical units method to allocate joint costs REQUIRED: MARKS 41 What would be the cost per ton of monuments and granite slabs. 7 assuming that the gratis accounted for as other income What would be the cost per ton of monuments and granite slabs. assuming that the grit is accounted for as by-product revente decocted from the main product cost? TOTAL MARKS Carmimandum 5 9 Cemetery monuments are cut, polished, and engraved in a variety of standard shapes, sizes, and pattems and sold to funeral homes. Architectural granite slabs are special-ordered by contractors for office buildings. These slabs are cut and polished to exacting specifications. The small pieces of granite resulting from the cutting process are crushed and sold to farm-supply outlets as poultry grit . Scorpion City has provided the following costs and output information: Process Cost Tons of Output Quarry $350,000 100,000 Cutting 250,000 90,000 Monuments 300,000 25,000 Granite slabs 400,000 60,000 Grit 10,000 5.000 Quarry and Cutting are joint processes. A local farm-supply distributor purchases all of the grit that is produced at $40 per ton. Assume that Scorpion City uses the physical units method to allocate joint costs REQUIRED: MARKS What would be the cost per ton of monuments and granite slabs, 4.1 7 assuming that the grit is accounted for as other income". What would be the cost per ton of monuments and granite slabs, 4.2 assuming that the grit is accounted for as by-product revenue deducted 3 from the main product cost? TOTAL MARKS 10