Question
1 Approved Answer
Develop a suitable Risk Breakdown Structure (RBS) for the Coventry rail station project and connect each of the risks in the risk register to this
Develop a suitable Risk Breakdown Structure (RBS) for the Coventry rail station project and connect each of the risks in the risk register to this RBS. Present a summary of this in your report (not the entire list) and give a clear justification for your choice of RBS. Make a Likelihood-Impact matrix where all risks from the risk register are represented (You do not need to mention each Risk ID specifically, generic symbols, eg. , suffice). Using your Likelihood-Impact matrix, rank the categories in the RBS from most to least important, and explain your reasoning. Appendix- Risk Register Risk Id Status Risk Title Risk Description Impact / Modelling Note Risk Measure Probability Impact Scheme Generic Repair time will impact on commissioning Programme delay cost REF005 New equipment (e.g. cable joints) fails when commissioning the new system Open New equipment fails 2 3 REF006 Open Specialist staff 3 4 Specialist staff may be required and they are booked in advance Scheme not viable Programme delay cost Programme objectives REF018 Specialist staff required to undertake the works may be unavailable Unable to rationalise current freight/passenger operations to achieve business case capacity Possessions granted late by NWR authority, works cannot be completed during possession Open Freight Operations 2 4 Additional shift costs if possessions lost REF002 Open Late possessions Cost 4 2 REF004 Open Cost 3 4 REF010 Open Cost 1 3 Estimating uncertainty There is uncertainty in the rates/quantities -10% to +40% on construction/labour included in the base cost costs Infrastructure damage Existing infrastructure may be damaged during Cost of repairing/ replacing damaged construction equipment Polluted ground Uncertain extent/ activity of ground contamination Cost of treatment/ disposal different from (e.g. PCBs) expected Availability of signalling records and resource to Cost of regenerating signalling records & Signalling Records undertake any modifications parallel design REF013 Open Cost 5 2 REF015 Open Cost 5 1 REF016 Open Increased scheme costs for upgrading existing control centres. Moderate demand requirements Retail Telecoms Cost 2 2 Lack of capacity of existing retail telecoms control centre to accommodate additional requirements at proposed new and altered stations Requirement to relocatel divert general line side signalling and telecommunication as sets REF017 Open Increased cost of diversion/protection and timescales for Signalling Maintenance Testing Handbook (SMTH) procedures. Cables routes evident at all locations Cable Diversions Cost 3 3 Theft and vandalism disrupts works REF019 Open Theft and vandalism Cost 3 2 Cost of replacing damaged/ stolen as sets (Max equipment stolen prior to a major possession) May be necessary to pay for removal of vegetation Additional site clearance costs (vegetation) REF023 Open Site clearance Cost 2 1 REF024 Open Fly tipping May be necessary to remove fly tipping materials Additional cost of removal and disposal Cost 2 1 REF025 Open Japanese knotweed Cost 2 1 REF026 Open SSSI Cost May be necessary to remove Japanese Additional costs of specialist removal Knotweed Working in close proximity to a site of special Cost of specialist consultants scientific interest (e.g. Sand eels must not be disturbed) Issues associated with safety case approvals Cost of design changes to satisfy Department of Transport 1 1 REFO 28 Open Safety Case Cost 3 2 REF029 Open Interfacing Projects Cost 2 1 Planned interfacing enhancement/renewal schemes Exceptionally adverse weather occurs (while constructing) Modification to NUCKLE design to accommodate interfacing designs Failure to achieve productivity, inability to get materials or labour to site Schedule REF001 Open Weather 2 3 Risk Id Status Risk Title Risk Description Impact / Modelling Note Risk Measure Probability Impact REF027 Open OHLE records are old. Scope unknown Additional cost and programme delay. Cost Overhead Electrification Equipment (OHLE) records 3 3 Additional cost and programme delay REF028 Open Signalling Scope Scope of re-signalling required to develop new passenger bay platform is currently uncertain Cost 2 2 REF030 Open Power Capacity Cost 4 3 Inadequate capacity of power supply and local Increased cost of power supply grid network to accommodate the electrical infrastructure and delay to the programme demand requirements of the proposed as a result of necessary possessions. reconfigured railway station Uncertain land take from maintenance compound Cost of altemative parking for station and adjacent station car park operator REF031 Open Additional Land Cost 5 2 REF032 Open Station Change Cost 4 2 REF034 Open Passenger Flows Cost 3 4. REF035 REF035 Open Drainage Station operator objects to proposed changes to cost of additional changes to meet station existing station (e.g. passenger access from car operator requirements park to station) Inability of proposed layout to accommodate Cost of additional station improvements passenger flows from new platform under Warwick road bridge to Coventry station complex Outfall for drainage and track drainage is either at Additional drainage measures are full capacity or cannot be established required. Nominal increase in drainage volume Objections to network change proposal to Additional permanent way material costs. remove existing operational sidings Programme delay whilst negotiate and satisfy objections Required derogation for building platforms on 1 in Additional cost of vertical track realignment 300 track gradient rejected Uncertain ground conditions Cost of ground improvements Cost 2 2 REF037 Open Network Change Cost 2. 4 REF040 Open Platform Derogation Cost 1 2 REF0151 Open Ground conditions Cost 2 2 REF0161 Open Identified services Cost 2 REF01 71 Open Uncertain location of known underground Cost of protection/diversion different from services expected Uncertain location of unknown underground Cost of protection/diversion different from services expected 3rd party objections to scheme Additional cost to satisfy objections nw Unidentified services Cost 3 REF0181 Open 3rd part objections Cost 2 1 Interface between projects Interface with Connecting Coventry and Friar gate Open Programme delays and increased cost of construction logistics and design iterations REF0201 Cost 5 1 Uncertainty of p-way quantities and rates P-way costs different from expected REF0211 Open Estimating uncertainty Cost 5 2 REF0221 Open Estimating uncertainty Uncertainty of signalling quantities and rates Signalling costs different from expected Cost 4 2 REF0231 Open Cost 4 1 REF0241 Open Estimating uncertainty Uncertainty of platform works quantities and rates Platform works costs different from expected Estimating uncertainty Uncertainty of station building ancillaries Platform ancillaries costs different from quantities and rates expected Estimating uncertainty Uncertainty of prelims quantities and rates Prelims costs different from expected Cost 4 2 REF0251 Open Cost 5 2 REF0261 Open Market conditions Cost 3 2 An unknown future legislation change on design Unknown features. Prevailing market conditions. Materials prices are Difference from expected different from expected. REF0281 Open Market conditions Cost 4 3 Develop a suitable Risk Breakdown Structure (RBS) for the Coventry rail station project and connect each of the risks in the risk register to this RBS. Present a summary of this in your report (not the entire list) and give a clear justification for your choice of RBS. Make a Likelihood-Impact matrix where all risks from the risk register are represented (You do not need to mention each Risk ID specifically, generic symbols, eg. , suffice). Using your Likelihood-Impact matrix, rank the categories in the RBS from most to least important, and explain your reasoning. Appendix- Risk Register Risk Id Status Risk Title Risk Description Impact / Modelling Note Risk Measure Probability Impact Scheme Generic Repair time will impact on commissioning Programme delay cost REF005 New equipment (e.g. cable joints) fails when commissioning the new system Open New equipment fails 2 3 REF006 Open Specialist staff 3 4 Specialist staff may be required and they are booked in advance Scheme not viable Programme delay cost Programme objectives REF018 Specialist staff required to undertake the works may be unavailable Unable to rationalise current freight/passenger operations to achieve business case capacity Possessions granted late by NWR authority, works cannot be completed during possession Open Freight Operations 2 4 Additional shift costs if possessions lost REF002 Open Late possessions Cost 4 2 REF004 Open Cost 3 4 REF010 Open Cost 1 3 Estimating uncertainty There is uncertainty in the rates/quantities -10% to +40% on construction/labour included in the base cost costs Infrastructure damage Existing infrastructure may be damaged during Cost of repairing/ replacing damaged construction equipment Polluted ground Uncertain extent/ activity of ground contamination Cost of treatment/ disposal different from (e.g. PCBs) expected Availability of signalling records and resource to Cost of regenerating signalling records & Signalling Records undertake any modifications parallel design REF013 Open Cost 5 2 REF015 Open Cost 5 1 REF016 Open Increased scheme costs for upgrading existing control centres. Moderate demand requirements Retail Telecoms Cost 2 2 Lack of capacity of existing retail telecoms control centre to accommodate additional requirements at proposed new and altered stations Requirement to relocatel divert general line side signalling and telecommunication as sets REF017 Open Increased cost of diversion/protection and timescales for Signalling Maintenance Testing Handbook (SMTH) procedures. Cables routes evident at all locations Cable Diversions Cost 3 3 Theft and vandalism disrupts works REF019 Open Theft and vandalism Cost 3 2 Cost of replacing damaged/ stolen as sets (Max equipment stolen prior to a major possession) May be necessary to pay for removal of vegetation Additional site clearance costs (vegetation) REF023 Open Site clearance Cost 2 1 REF024 Open Fly tipping May be necessary to remove fly tipping materials Additional cost of removal and disposal Cost 2 1 REF025 Open Japanese knotweed Cost 2 1 REF026 Open SSSI Cost May be necessary to remove Japanese Additional costs of specialist removal Knotweed Working in close proximity to a site of special Cost of specialist consultants scientific interest (e.g. Sand eels must not be disturbed) Issues associated with safety case approvals Cost of design changes to satisfy Department of Transport 1 1 REFO 28 Open Safety Case Cost 3 2 REF029 Open Interfacing Projects Cost 2 1 Planned interfacing enhancement/renewal schemes Exceptionally adverse weather occurs (while constructing) Modification to NUCKLE design to accommodate interfacing designs Failure to achieve productivity, inability to get materials or labour to site Schedule REF001 Open Weather 2 3 Risk Id Status Risk Title Risk Description Impact / Modelling Note Risk Measure Probability Impact REF027 Open OHLE records are old. Scope unknown Additional cost and programme delay. Cost Overhead Electrification Equipment (OHLE) records 3 3 Additional cost and programme delay REF028 Open Signalling Scope Scope of re-signalling required to develop new passenger bay platform is currently uncertain Cost 2 2 REF030 Open Power Capacity Cost 4 3 Inadequate capacity of power supply and local Increased cost of power supply grid network to accommodate the electrical infrastructure and delay to the programme demand requirements of the proposed as a result of necessary possessions. reconfigured railway station Uncertain land take from maintenance compound Cost of altemative parking for station and adjacent station car park operator REF031 Open Additional Land Cost 5 2 REF032 Open Station Change Cost 4 2 REF034 Open Passenger Flows Cost 3 4. REF035 REF035 Open Drainage Station operator objects to proposed changes to cost of additional changes to meet station existing station (e.g. passenger access from car operator requirements park to station) Inability of proposed layout to accommodate Cost of additional station improvements passenger flows from new platform under Warwick road bridge to Coventry station complex Outfall for drainage and track drainage is either at Additional drainage measures are full capacity or cannot be established required. Nominal increase in drainage volume Objections to network change proposal to Additional permanent way material costs. remove existing operational sidings Programme delay whilst negotiate and satisfy objections Required derogation for building platforms on 1 in Additional cost of vertical track realignment 300 track gradient rejected Uncertain ground conditions Cost of ground improvements Cost 2 2 REF037 Open Network Change Cost 2. 4 REF040 Open Platform Derogation Cost 1 2 REF0151 Open Ground conditions Cost 2 2 REF0161 Open Identified services Cost 2 REF01 71 Open Uncertain location of known underground Cost of protection/diversion different from services expected Uncertain location of unknown underground Cost of protection/diversion different from services expected 3rd party objections to scheme Additional cost to satisfy objections nw Unidentified services Cost 3 REF0181 Open 3rd part objections Cost 2 1 Interface between projects Interface with Connecting Coventry and Friar gate Open Programme delays and increased cost of construction logistics and design iterations REF0201 Cost 5 1 Uncertainty of p-way quantities and rates P-way costs different from expected REF0211 Open Estimating uncertainty Cost 5 2 REF0221 Open Estimating uncertainty Uncertainty of signalling quantities and rates Signalling costs different from expected Cost 4 2 REF0231 Open Cost 4 1 REF0241 Open Estimating uncertainty Uncertainty of platform works quantities and rates Platform works costs different from expected Estimating uncertainty Uncertainty of station building ancillaries Platform ancillaries costs different from quantities and rates expected Estimating uncertainty Uncertainty of prelims quantities and rates Prelims costs different from expected Cost 4 2 REF0251 Open Cost 5 2 REF0261 Open Market conditions Cost 3 2 An unknown future legislation change on design Unknown features. Prevailing market conditions. Materials prices are Difference from expected different from expected. REF0281 Open Market conditions Cost 4 3
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started