Scenario 11.1 Sunshine Manufacturing produces three products: X,Y,Z. The production of these end items is controlled by an MRP system. Each end item X is
Scenario 11.1 Sunshine Manufacturing produces three products: X,Y,Z. The production of these end items is controlled by an MRP system. Each end item X is assembled with two components of A and one component of B. Each end item of Y is assembled with two components of C and one component of A. End item Z is assembled from one unit of D and one unit of C D is manufactured from one unit of A; and C is manufactured from one unit of B. Use the information in Scenario 11.1. If item C has a manufacturing lead time of two weeks, and a planned receipt of 65 units is needed in week 4 , which of the following statements is true? The gross requirements for item B in week 2 is 65 units. The planned order release in week 2 for item C is 130 units. The gross requirements for item B in week 4 is 65 units. The gross requirements for item B in week 2 is 130 units
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started