Trico Company set the following standard unit costs for its single product. Direct materials (30 Ibs. @ $4.80 per Ib.) $ 144.00 Direct labor (7
Trico Company set the following standard unit costs for its single product.
Direct materials (30 Ibs. @ $4.80 per Ib.) | $ | 144.00 |
Direct labor (7 hrs. @ $14 per hr.) | 98.00 | |
Factory overheadvariable (7 hrs. @ $6 per hr.) | 42.00 | |
Factory overheadfixed (7 hrs. @ $9 per hr.) | 63.00 | |
Total standard cost | $ | 347.00 |
The predetermined overhead rate is based on a planned operating volume of 80% of the productive capacity of 64,000 units per quarter. The following flexible budget information is available.
Operating Levels | ||||||
70% | 80% | 90% | ||||
Production in units | 44,800 | 51,200 | 57,600 | |||
Standard direct labor hours | 313,600 | 358,400 | 403,200 | |||
Budgeted overhead | ||||||
Fixed factory overhead | $ | 3,225,600 | $ | 3,225,600 | $ | 3,225,600 |
Variable factory overhead | $ | 1,881,600 | $ | 2,150,400 | $ | 2,419,200 |
During the current quarter, the company operated at 90% of capacity and produced 57,600 units of product; actual direct labor totaled 400,200 hours. Units produced were assigned the following standard costs.
Direct materials (1,728,000 Ibs. @ $4.80 per Ib.) | $ | 8,294,400 |
Direct labor (403,200 hrs. @ $14 per hr.) | 5,644,800 | |
Factory overhead (403,200 hrs. @ $15 per hr.) | 6,048,000 | |
Total standard cost | $ | 19,987,200 |
Actual costs incurred during the current quarter follow.
Direct materials (1,715,000 Ibs. @ $6.30 per lb.) | $ | 10,804,500 |
Direct labor (400,200 hrs. @ $11.00 per hr.) | 4,402,200 | |
Fixed factory overhead costs | 2,813,800 | |
Variable factory overhead costs | 2,634,200 | |
Total actual costs | $ | 20,654,700 |
AH-Actual Hours SH Standard Hours AVR Actual Variable Rate SVR Standard Variable Rate Actual Variable OH Cost Flexible Budget Standard Cost (VOH applied) SH AH AVR SH SVR SVR AH-Actual Hours SH = Standard Hours AFR = Actual Fixed Rate SFR Standard Fixed Rate Actual Fixed OH Cost AH Budgeted Overhead Standard Cost (FOH applied) SH AVR SVR (c) Compute the total overhead controllable variance. Overhead Controllable Variance Total overhead controllable variance
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started