Turbines 8. (10 pts) A hydraulic turbine is used to power a lift in a remote construction site, as shown in Fig. 1. The
Turbines 8. (10 pts) A hydraulic turbine is used to power a lift in a remote construction site, as shown in Fig. 1. The turbine is supplied with water from a large elevated reservoir with a head H = 15 m. The flow rate is increased gradually and found to be Q = 41/s, when the load starts getting lifted. The turbine shaft is coupled to a pulley with a diameter d = 0.40 m through a speed-reducing gearbox with a gear ratio 10:1. A steel cable is attached to this pulley and passes through additional pulleys, shown in the figure, so that, as the turbine operates, the cable lifts the load that has a mass m = 100 kg. Assume that the turbine efficiency is roughly 80%, the gearbox efficiency is 75% and neglect frictional losses in any other part of this system. h m H Q Fig. 1: Sketch of the turbine-powered lift system. (a) Determine the rotational speed of the pulley, in rpm, when the load starts getting lifted. (b) Determine the corresponding rotational speed of the turbine, in rpm. (c) Determine the time it would take for the load to be lifted to a platform located at h = 8 m.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Solutions Step 1 Explanation The answer provided below has been developed in a clear step by ...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started