Two machines both have an average capacity of 200 units per hour and are functioning 80% of the time. Machine A is not down very
Two machines both have an average capacity of 200 units per hour and are functioning 80% of the time. Machine A is not down very frequently, but when it is down the outages are long. Machine B is down often, but when it is down the outages are short. Which machine do you select?
a). Machine A because its variability is higher.
b). Machine B because its variability is higher.
c). Machine A because its variability is lower.
d). Machine B because its variability is lower.