Answered step by step
Verified Expert Solution
Question
1 Approved Answer
. . . TX 1. General Foundry, Inc., a metal works plant in Milwaukee, has long been trying to avoid the expense of installing air
. . . TX 1. General Foundry, Inc., a metal works plant in Milwaukee, has long been trying to avoid the expense of installing air pollution control equipment. The local environment protection group has recently given the foundry 18 weeks to install a complex air filter system on its main smokestack. General Foundry has been warned that it may be forced to close unless the device is installed in the allotted period. Lester Harky, the managing partner, wants to make sure that installation of the filtering system progressed smoothly and on time. General Foundry has identified the following eight activities that need to be performed and their sequential relationship. Activity Description Time Immediate weeks) Predecessors A Build internal components 2 B Modify roof and floor 4 C Construct collection stack 2 A D Pour concrete and install frame 4 A, B E Build high-temperature burner 4 C F Install pollution control system 3 C G Install air pollution device 6 D, E H Inspect and test 3 F, G a. Construct the appropriate network diagram. (10 points) b. Which jobs can be delayed without delaying the project completion time? (10 points) c. Can General Foundry complete the project on time? Why or why not? (20 points) d. Suppose Lester wants to shorten the completion time by one week and his options are: (1) Reduce activity D by one week, which costs $700/week; (2) Reduce activity E by one week, which costs $800/week; (3) Reduce activity G by one week, which costs $1000/week; Type here to search zoom f W 3:09 PM O . C 2/28/2024. . . A . 3 . . 5 b. Which jobs can be delayed without delaying the project completion time? (10 points) c. Can General Foundry complete the project on time? Why or why not? (20 points) d. Suppose Lester wants to shorten the completion time by one week and his options are: (1) Reduce activity D by one week, which costs $700/week; (2) Reduce activity E by one week, which costs $800/week; (3) Reduce activity G by one week, which costs $1000/week; If General Foundry saves $2000 for each week that the earliest completion time is reduced, which single option, if any, should Lester choose? And why? (10 points) 3 3:11 PM Type here to search zoom D f W Earn... X 2/28/2024
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started