Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Unimart is a copy center and office supplies seller at IU's Al building. Currently, they are preparing a large oder of Lecture Notes for 2

image text in transcribedimage text in transcribed

Unimart is a copy center and office supplies seller at IU's Al building. Currently, they are preparing a large oder of Lecture Notes for 2 departments: Department of English, Department of Physics, Department of Mathematics. The center operates 2 four-hour shift per day, 6 days per week, 52 weeks per year. The manager believes that a capacity cushion of 20% is the best. The center currently has 3 copy machines and makes multiple copies (the lot size) of each report. The processing time to run, collate, and bind each copy depends on, among other factors, the number of pages, as shown in the below table: Item English Dept. Physics Dept. Mathematics Dept. Annual demand, D (copies) 3,200 4,700 4,300 Standard processing time, p (hours/copy) 0.70 0.60 0.50 Average lot size, Q (copies/lot) 100 110 Standard setup time, s (hours) 0.25 0.40 0.30 120 a. What is the minimum number of machines needed at the copy center to meet the forecast annual of these 3 departments? (20 points) b. If the center currently has 3 copy machines, how many additional machines should be bought so that Unimart can guarantee the supply to these 3 departments? (15 points) c. If the center currently has 2 copy machines, what is the capacity gap? (15 points) Unimart is a copy center and office supplies seller at IU's Al building. Currently, they are preparing a large oder of Lecture Notes for 2 departments: Department of English, Department of Physics, Department of Mathematics. The center operates 2 four-hour shift per day, 6 days per week, 52 weeks per year. The manager believes that a capacity cushion of 20% is the best. The center currently has 3 copy machines and makes multiple copies (the lot size) of each report. The processing time to run, collate, and bind each copy depends on, among other factors, the number of pages, as shown in the below table: Item English Dept. Physics Dept. Mathematics Dept. Annual demand, D (copies) 3,200 4,700 4,300 Standard processing time, p (hours/copy) 0.70 0.60 0.50 Average lot size, Q (copies/lot) 100 110 Standard setup time, s (hours) 0.25 0.40 0.30 120 a. What is the minimum number of machines needed at the copy center to meet the forecast annual of these 3 departments? (20 points) b. If the center currently has 3 copy machines, how many additional machines should be bought so that Unimart can guarantee the supply to these 3 departments? (15 points) c. If the center currently has 2 copy machines, what is the capacity gap? (15 points)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

More Books

Students also viewed these Accounting questions

Question

Compose the six common types of social business messages.

Answered: 1 week ago

Question

Describe positive and neutral messages.

Answered: 1 week ago