UNIVERSITY OF ENERGY AND NATURAL RESOURCES, SUNYANI SCHOOL OF SCIENCES DEPARTMENT OF MATHEMATICS AND STATISTICS LEVEL, 200, Mid-Semester Examination, 2021/2022 BSc. Mathematics, Computer Science \& Information Technology MATH/COMP 214: NUMERICAL ANALYSIS AND COMPUTATION I August, 2022 Time: 1 Hour Answer question ONE and any other ONE question 1. The Tanoso clay factory produces four different product, Bricks, Hollow Blocks, Roofing tiles, and Flower pots. The amount of the inputs available for production are as follows, clay is 10500 grams, water is 200 liters, time is 5200minutes and heat is 7000 Joules. The market survey indicate that 1. the quantity of blocks produced must be 35% of the total number of all products ii. the number of flower pots must be 8% the number of roofing sheets. The input requirement per unit of each of the products is as shown in the Table below. Formulate a linear system of equations of the company's operation. [8 Marks] UNIVERSITY OF ENERGY AND NATURAL RESOURCES, SUNYANI SCHOOL OF SCIENCES DEPARTMENT OF MATHEMATICS AND STATISTICS LEVEL, 200, Mid-Semester Examination, 2021/2022 BSc. Mathematics, Computer Science \& Information Technology MATH/COMP 214: NUMERICAL ANALYSIS AND COMPUTATION I August, 2022 Time: 1 Hour Answer question ONE and any other ONE question 1. The Tanoso clay factory produces four different product, Bricks, Hollow Blocks, Roofing tiles, and Flower pots. The amount of the inputs available for production are as follows, clay is 10500 grams, water is 200 liters, time is 5200minutes and heat is 7000 Joules. The market survey indicate that 1. the quantity of blocks produced must be 35% of the total number of all products ii. the number of flower pots must be 8% the number of roofing sheets. The input requirement per unit of each of the products is as shown in the Table below. Formulate a linear system of equations of the company's operation. [8 Marks]