Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

use promodel for the model building and provide text file Provide Text file Question 2 (workbook (7): United Electronics manufactures small custom electronic assemblies Parts

use promodel for the model building and provide text file

image text in transcribed

Provide Text file Question 2 (workbook (7): United Electronics manufactures small custom electronic assemblies Parts must be processed through four stations assembly, soldering, painting and inspection. Orders arrive with an exponential interarrival distribution (mean 20 minutes). The process time distribution are shown in Table: Assembly Uniform (13.5 +1.5) minutes Soldering Normal (36,10) minutes Painting Uniform (55 +15) minutes Inspection Exponential (8) minutes Process time distributions at united Electronics The soldering operation can perform three jobs at a time. Painting can done on four jobs at a time. Assembly and inspection are performed on one job at a time Create a simulation model of this system. Simulate this manufacturing system for 2000 hours. Collect and report statistics on the utilization of each station and total number of jobs manufactured during each 8 hours shift (average and maximum). Provide text file Soldering capacity - 3, Painting capacity 4 in Arrivals Occurrences = Inf Page 1 of 2 Provide Text file Question 2 (workbook (7): United Electronics manufactures small custom electronic assemblies Parts must be processed through four stations assembly, soldering, painting and inspection. Orders arrive with an exponential interarrival distribution (mean 20 minutes). The process time distribution are shown in Table: Assembly Uniform (13.5 +1.5) minutes Soldering Normal (36,10) minutes Painting Uniform (55 +15) minutes Inspection Exponential (8) minutes Process time distributions at united Electronics The soldering operation can perform three jobs at a time. Painting can done on four jobs at a time. Assembly and inspection are performed on one job at a time Create a simulation model of this system. Simulate this manufacturing system for 2000 hours. Collect and report statistics on the utilization of each station and total number of jobs manufactured during each 8 hours shift (average and maximum). Provide text file Soldering capacity - 3, Painting capacity 4 in Arrivals Occurrences = Inf Page 1 of 2

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Auditing and Assurance Services A Systematic Approach

Authors: William Messier, Steven Glover, Douglas Prawitt

9th edition

1308361491, 77862333, 978-1259248290, 9780077862336, 1259162346, 978-1259162343

More Books

Students also viewed these Accounting questions