Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Use the sample sizes and the number of deviations determined below. Control Procedure Parameters 1 2 3 4 Risk of incorrect acceptance 5 % 5

Use the sample sizes and the number of deviations determined below.

Control Procedure
Parameters 1 2 3 4
Risk of incorrect acceptance 5 % 5 % 10 % 10 %
Tolerable deviation rate 4 % 5 % 7 % 8 %
Expected population deviation rate 1 % 2 % 3 % 4 %
Sample size (using tables) 156 181 94 98
Sample size (using IDEA) 156 181 94 98

Determine the sample deviation rate, the computed upper deviation rate, and the auditors conclusion (i.e., testing results do or do not support operating effectiveness of the control) for each control procedure. (Leave no cell blank - Be sure to enter "0" if required. Round your rates values to 1 decimal place. Omit the % sign in your response.)

Results (Using Table 88 & Table 89 or IDEA) 1 2 3 4
Number of deviations 0 5 4 3
Sample size
Sample deviation rate % % % %
Computed upper deviation rate using Tables % % % %
1-Sided upper limit using IDEA % % %

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions