Using lathe and milling machines, for 8 hr/day, an operator is cutting down a part to a specific size. Three main elements are needed:

Using lathe and milling machines, for 8 hr/day, an operator is cutting down a part to a specific size. Three main elements ar 

Using lathe and milling machines, for 8 hr/day, an operator is cutting down a part to a specific size. Three main elements are needed: A) Set part into Vice, B) Machine part and C) Remove part, inspect it and stack it. Assuming a background noise level of 92 dBA, determine the following: a) b) c) d) e) f) Complete the following time study sheet [Fill all blanks in yelow] and Calculate the total Standard Time for the operation, if the study is acceptable. Using the Figure below, develop MOST analysis for this assembly and calculate the Standard Time [Use same % allowances as in Part (a)]. No. Compare between the results in a) and b). Which of the two values of Standard Time would you recommend? Why? If a new hired operator, who has 85% learning rate, takes 5.5 min to complete the first board, how long would it take to reach the Standard Time recommended from Part c)? [Show all your calculations] If the operator is paid $15/hr, how much would be the earning for a stack of 100 parts? 1) Under day work plan 2) Under standard hour plan. If the operator had an emergency after 1 hour from starting the shift and took a break, how productivity will be affected? [ Show all your calculations]. Activity Conditions Method MOST calculation - No. A B Code Date Sign. Page 1 2 3 Total No. of Observations Average Total NT Standard Time 4 R W OT NT 105 205 Sequence Model ABG ABP A ABG ABP A A B GAB A A B B G A B P A ABG A B P A 110 340 Foreign Elements W1 W2 OT Description 230 235 415 420 texting drinking Fr. TMU R W 100 65 100 325 100 0 100 460 OT NT Finishing Time Starting Time Elapse Time TEBS 120 TEAF Total Check Time 180 520 Effective Time Ineffective Time Total Recorded Time Unaccounted Time Re cording error: Record % error: R 105 90 Time Check 8:47 W 85 OT NT Total Standard Time 1 1 Personal Needs Basic Fatigue Variable Fatigue Special Total Allowances% Remarks

Step by Step Solution

There are 3 Steps involved in it

Step: 1

To determine the noise level for each of the three main elements involved in cutting down a part us... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Corporate Computer Security

Authors: Randy Boyle, Raymond Panko

4th edition

133545199, 978-0133545197

More Books

Students also viewed these Finance questions