Using the FCFS rule for scheduling, the sequence is For the schedule developed using the FCFS rule, the total length of time taken to and
Using the FCFS rule for scheduling, the sequence is For the schedule developed using the FCFS rule, the total length of time taken to and sewing (process 1) and delivery (process 2) of each of the sui