Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Using the risk of incorrect acceptance, tolerable deviation rate, sample size, and the number of deviations shown below, determine the sample deviation rate, computed upper

Using the risk of incorrect acceptance, tolerable deviation rate, sample size, and the number of deviations shown below, determine the sample deviation rate, computed upper deviation rate, and the auditor's conclusion (i.e., testing results do or do not support operating effectiveness of the control) for each control procedure. Use Tables 8-8 and 8-9 below for reference.

image text in transcribed

1 10% 5% 5 Control Procedure 2 3 10% 5% 4% 45 75 2 1 10% Parameters Risk of incorrect acceptance Tolerable Deviation Rate Sample size Number of Deviations Sample Deviation Rate Computed upper Deviation Rate Auditor's Conclusion 4 4 5% 5% 125 2. 80 0 TABLE 8-8 Statistical Sample Results Evaluation Table (Computed Upper Deviation Rates) for Attribute Sampling-95 Percent Desired Confidence Level Actual Number of Deviations Found 3 4 5 6 7 7 Sample Size 0 1 2 8 9 10 25 30 35 40 45 50 55 60 65 70 75 an 80 90 100 125 150 200 11.3 9.5 8.3 7.3 6.5 5.9 5.4 4.9 4.6 4.2 4.0 3.7 3.3 3.0 2.4 2.0 1.5 17.6 14.9 12.9 11.4 10.2 9.2 8.4 7.7 7.1 6.6 6.2 5.8 5.2 4.7 3.8 3.2 2.4 19.6 17.0 15.0 13.4 12.1 11.1 10.2 9.4 8.8 8.2 7.7 6.9 6.2 5.0 4.2 3.2 18.3 16.4 14.8 13.5 12.5 11.5 10.8 10.1 95 9.5 8.4 7.6 6.1 5.1 3.9 19.2 17.4 15.9 14.7 13.6 12.6 11.8 11.1 9.9 9.0 7.2 6.0 4.6 19.9 18.2 16.8 15.5 14.5 13.6 127 12.7 11.4 10.3 8.3 6.9 5.2 18.8 17.4 16.3 15.2 14.3 12.8 11.5 9.3 7.8 5.9 19.3 18.0 16.9 15.9 14.2 12.8 10.3 8.6 6.5 20.0 18.9 16.8 19.7 18.5 17.4 15.5 14.0 11.3 9.5 7.2 15.2 12.3 10.3 7.8 18.2 16.4 13.2 11.1 8.4 Over 20 percent. ". TABLE 8-9 Statistical Sample Results Evaluation Table (Computed Upper Deviation Rates) for Attribute Sampling-90 Percent Desired Confidence Level Actual Number of Deviations Found 3 3 4 5 6 7 0 1 2 8 9 10 . Sample Size 20 25 30 35 40 45 50 55 60 70 80 90 100 120 160 200 10.9 8.8 7.4 6.4 5.6 5.0 4.6 4.1 20 3.8 3.3 2.9 2.6 2.3 2.0 1.5 1.2 18.1 14.7 12.4 10.7 9.4 8.4 7.6 6.9 6.4 5.5 4.8 4.3 3.9 3.3 2.5 2.0 19.9 16.8 14.5 12.8 11.4 10.3 9.4 8.7 7.5 6.6 5.9 5.3 4.4 3.3 2.7 18.1 16.0 14.3 12.9 11.8 10.8 9.3 8.2 7.3 6.6 5.5 4.2 3.4 19.0 17.0 15.4 14.1 12.9 11.1 9.8 8.7 7.9 6.6 5.0 4.0 19.7 17.8 16.3 15.0 12.9 11.3 10.1 9.1 7.6 5.8 4.6 18.4 16.9 14.6 12.8 11.5 10.3 8.7 6.5 5.3 18.9 16.3 14.3 12.8 11.5 9.7 7.3 5.9 17.9 15.8 14.1 12.7 10.7 8.0 6.5 19.6 17.2 15.4 13.9 11.6 8.8 7.1 18.6 16.6 15.0 12.6 9.5 7.6 "Over 20 percent 1 10% 5% 5 Control Procedure 2 3 10% 5% 4% 45 75 2 1 10% Parameters Risk of incorrect acceptance Tolerable Deviation Rate Sample size Number of Deviations Sample Deviation Rate Computed upper Deviation Rate Auditor's Conclusion 4 4 5% 5% 125 2. 80 0 TABLE 8-8 Statistical Sample Results Evaluation Table (Computed Upper Deviation Rates) for Attribute Sampling-95 Percent Desired Confidence Level Actual Number of Deviations Found 3 4 5 6 7 7 Sample Size 0 1 2 8 9 10 25 30 35 40 45 50 55 60 65 70 75 an 80 90 100 125 150 200 11.3 9.5 8.3 7.3 6.5 5.9 5.4 4.9 4.6 4.2 4.0 3.7 3.3 3.0 2.4 2.0 1.5 17.6 14.9 12.9 11.4 10.2 9.2 8.4 7.7 7.1 6.6 6.2 5.8 5.2 4.7 3.8 3.2 2.4 19.6 17.0 15.0 13.4 12.1 11.1 10.2 9.4 8.8 8.2 7.7 6.9 6.2 5.0 4.2 3.2 18.3 16.4 14.8 13.5 12.5 11.5 10.8 10.1 95 9.5 8.4 7.6 6.1 5.1 3.9 19.2 17.4 15.9 14.7 13.6 12.6 11.8 11.1 9.9 9.0 7.2 6.0 4.6 19.9 18.2 16.8 15.5 14.5 13.6 127 12.7 11.4 10.3 8.3 6.9 5.2 18.8 17.4 16.3 15.2 14.3 12.8 11.5 9.3 7.8 5.9 19.3 18.0 16.9 15.9 14.2 12.8 10.3 8.6 6.5 20.0 18.9 16.8 19.7 18.5 17.4 15.5 14.0 11.3 9.5 7.2 15.2 12.3 10.3 7.8 18.2 16.4 13.2 11.1 8.4 Over 20 percent. ". TABLE 8-9 Statistical Sample Results Evaluation Table (Computed Upper Deviation Rates) for Attribute Sampling-90 Percent Desired Confidence Level Actual Number of Deviations Found 3 3 4 5 6 7 0 1 2 8 9 10 . Sample Size 20 25 30 35 40 45 50 55 60 70 80 90 100 120 160 200 10.9 8.8 7.4 6.4 5.6 5.0 4.6 4.1 20 3.8 3.3 2.9 2.6 2.3 2.0 1.5 1.2 18.1 14.7 12.4 10.7 9.4 8.4 7.6 6.9 6.4 5.5 4.8 4.3 3.9 3.3 2.5 2.0 19.9 16.8 14.5 12.8 11.4 10.3 9.4 8.7 7.5 6.6 5.9 5.3 4.4 3.3 2.7 18.1 16.0 14.3 12.9 11.8 10.8 9.3 8.2 7.3 6.6 5.5 4.2 3.4 19.0 17.0 15.4 14.1 12.9 11.1 9.8 8.7 7.9 6.6 5.0 4.0 19.7 17.8 16.3 15.0 12.9 11.3 10.1 9.1 7.6 5.8 4.6 18.4 16.9 14.6 12.8 11.5 10.3 8.7 6.5 5.3 18.9 16.3 14.3 12.8 11.5 9.7 7.3 5.9 17.9 15.8 14.1 12.7 10.7 8.0 6.5 19.6 17.2 15.4 13.9 11.6 8.8 7.1 18.6 16.6 15.0 12.6 9.5 7.6 "Over 20 percent

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Finance questions