Using the typical floor plan on next page as a base, propose a trunk & branches overhead layout of the ducts serving the typical floor's

Using the typical floor plan on next page as a base, propose a trunk & branches overhead layout of the ducts serving the typical floor's via mixing mechanical ventilation. 

 

1) Identify different zones in relation to solar orientation and space function that you think are different enough to justify supply of air at different temperature (i.e. prepared by its own Air Handling Unit (AHU) in the plant room located in the basement). Callout neatly the zones you think would correspond to the different subdivision of the space associated each with an air handling unit. Use a thick floppy color outline, or a transparent color overlay. 

 

2) Identify the location of two or three vertical air shafts. Such shafts are typically located in the cores, adjacent to bathrooms or possibly near elevators. Leave the existing elevator shafts alone, don't take them over. Create a new shaft if needed (I think so). 

 

3) Using blue single continuous lines, draw the supply air trunks originated from the each shaft respectively, along with the branches to reach the workstation and other open spaces. Provide approx. one supply point/diffuser per desk (or small grouping of desks), as well as other supply points spread across common area spaces. Make sure that a given air supply trunk and its branches only supply spaces belonging to ONE zone. In contrast to the many air supply points, provide only few return points (either near the shaft, or via a return duct say from a meeting room back to the nearest shaft.). Enclosed meeting room must have they own return. 

 

Use blue for supply duct runs/branches and vertical ducts in shafts. Use red for return ducts and vertical ducts in shafts

image

Image transcription text

Not To Scale. North is pointing left East Fire stair 1 "bridge" void loggia North loggia Atrium South void Fire stair 2 Elevators
Bathrooms Bathrooms VICH Party wall against neighboring building

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Automation Production Systems and Computer Integrated Manufacturing

Authors: Mikell P.Groover

3rd edition

132393212, 978-0132393218

More Books

Students also viewed these Mechanical Engineering questions

Question

Explain the various methods of job evaluation

Answered: 1 week ago

Question

Differentiate Personnel Management and Human Resource Management

Answered: 1 week ago

Question

Describe the functions of Human resource management

Answered: 1 week ago

Question

What are the objectives of Human resource planning ?

Answered: 1 week ago

Question

What is an industrial robot?

Answered: 1 week ago

Question

What is the cycle time in a manufacturing operation?

Answered: 1 week ago