Using the waterfall methodology, at what stage of the SDLC is internal controls finalized? 1. Testing 2. Requirement gathering 3. Development/ Configuration 4. Design
Using the waterfall methodology, at what stage of the SDLC is internal controls finalized?
1. Testing
2. Requirement gathering
3. Development/ Configuration
4. Design
Step by Step Solution
There are 3 Steps involved in it
Step: 1