Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Using these Project Requirements and Work Breakdown Structure for Internet of Things (IoT) device vulnerability analysis. Create a project that accomplishes all of these things.

Using these Project Requirements and Work Breakdown Structure for Internet of Things (IoT) device vulnerability analysis. Create a project that accomplishes all of these things. Attach a Google Drive link containing the files.

image text in transcribedimage text in transcribed

\begin{tabular}{|l|l|} \hline 1 Functional & Example requirement \\ \hline 2 Operational & The system shall continously monitor the connected loT devices for any security vulnerabilities \\ \hline 3 Functional & The system shall provide the ability to generate a detailed report on the security vulnerabilities found on the loT devices \\ \hline 4 Performance & The system shall perform vulnerability scans on the connected IoT devices within less than 10 minutes \\ \hline 5 Physical & The system shall be able to operate in temperatures between 0 and 50 degrees Celsius \\ \hline 6 Environmental & The system shall be able to withstand impact from dropping of up to 1.5 meters \\ \hline 7 Functional & The system shall provide the ability to log and record all security events for auditing and compliance purposes \\ \hline 8 Operational & The system shall provide a comprehensive report on the vulnerabilities found, their potential impact and the mitigations implemented \\ \hline 9 Performance & The system shall have an uptime of at least 99.9% \\ \hline \end{tabular} 1.0 Planning 1.1 Research and Analysis 1.1.1 Identify vulnerable Io T devices 1.1.2 Gather information on device security 1.2 Project Proposal 1.2.1 Define project scope and objectives 1.2.2 Identify stakeholders 1.3 Risk Management 1.3.1 Identify potential risks 1.3.2 Develop risk mitigation strategies 2.0 Vulnerability Analysis 2.1 Network Analysis 2.1.1 Analyze network traffic 2.1.2 Identify communication protocols 2.2 Penetration Testing 2.2.1 Test for known vulnerabilities 2.2.2 Attempt unauthorized access 2.3 Code Review 2.3.1 Analyze device firmware 2.3.2 Identify insecure coding practices 3.0 Mitigation 3.1 Flaw Identification 3.1.1 Document identified vulnerabilities 3.1.2 Prioritize vulnerabilities based on risk 3.2 Mitigation Development 3.2.1 Develop mitigation strategies 3.2.2 Test effectiveness of mitigation techniques 3.3 Mitigation Implementation 3.3.1 Implement mitigation strategies 3.3.2 Test device security post-implementation

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

MySQL Crash Course A Hands On Introduction To Database Development

Authors: Rick Silva

1st Edition

1718503008, 978-1718503007

More Books

Students also viewed these Databases questions