using this mathematical model, solve the following : Given a process with design nominal = 5 Mils +/- 4 (or USL = 9 and LSL
using this mathematical model, solve the following : Given a process with design nominal = 5 Mils +/- 4 (or USL = 9 and LSL = 1) and Cpk = 0.85. A company decided to implement a system of calling the engineer to adjust the process every time a sample (n = 4) average (xbar) was equal to = nominal + specification limits (process average = 7 or 3)