Vance Asbestos Removal Company removes potentially toxic asbestos insulation and related products from buildings. The company's estimator has been invoived in a long-simmering dispute with the on-site work supervisors. The on-site supervisors dlaim that the estimator does not adequately distinguish between routine work, such as removal of asbestos insulation around heating plpes in older homes, and non-routine work, such as removing asbestos-contaminated celling plaster in Industrial buildings. The on-site supervisors believe that non-routine work is far more expensive than routine work and should bear higher customer charges, The estimator sums up his position in this way: "My job is to measure the area to be cleared of asbestos. As directed by top management, I simply multiply the square metres by $4,900 per thousand square metres to determine the bid price. Since our average cost is only $3,900 per thousand square metres, that leaves enough cushion to take care of the additional costs of non-routine work that shows up. Besides, it Is difficuit to know what is routine or not routine until you actually start tearing things apart. To shed light on this controversy, the company initiated an ABC study of all of its costs. Data from the ABC system follow: - The total number of jobs includes non-routine jobs as well as routine jobs. Non-routine jobs as well as routine jobs require estimating and setup work. Required: 1. Perform the first-stage allocation of costs to the activity cost pools. (Do not leove any empty spoces; input a 0 wherever it is required.) 2. Compute the activity rates for the activity cost pools. (Round your answers to 2 decimol ploces.) 3. Using the activity rates you have computed, determine the total cost and the average cost per thousand square metres of each of the following jobs according to the ABC system: o. A routine 2,000 -square-metre asbestos removal job. (Round your answers to 2 decimbl places.) b. A routine 4,000 -square-metre asbestos removal job. (Round your answers to 2 decimal ploces.) b. A routine 4,000-square-metre asbestos removal job. (Round your onswers to 2 decimal places.) c. A non-routine 2,000-square-metre asbestos removal job. (Round your answers to 2 decimol ploces.) 4. This pait of the question is not part of your Connect assignment