Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Vance Asbestos Removal Company removes potentlally toxic asbestos insulation and related products from bulldings. The company's estimator has been involved in a long-simmering dispute with

image text in transcribed

image text in transcribed

image text in transcribed

image text in transcribed

Vance Asbestos Removal Company removes potentlally toxic asbestos insulation and related products from bulldings. The company's estimator has been involved in a long-simmering dispute with the on-silte work supervisors. The on-site supervisors claim that the estimator does not adequately distingulsh between routine work, such as removal of asbestos insulation around heating pipes in older homes, and non-routine work, such as removing asbestos-contaminated celling plaster in industrial bulldings. The on-site supervisors belleve that non-routine work is far more expensive than routine work and should bear higher customer charges. The estimator sums up his position in this way: "My job is to measure the area to be cleared of asbestos. As directed by top management, I simply multiply the square metres by $4,800 per thousand square metres to determine the bid price. Since our average cost is only $3,800 per thousand square metres, that leaves enough cushion to take care of the additional costs of non-routine work that shows up. Besides, it is difficult to know what is routine or not routine until you actually start tearing things apart." To shed light on this controversy, the company initiated an ABC study of all of its costs. Data from the ABC system follow: * The total number of jobs includes non-routine jobs as well as routine jobs. Non-routine jobs as well as routine jobs require estimating and setup work. Requirect: 1. Perform the first-stage allocation of costs to the activity cost pools. (Do not leave any empty spaces; input a 0 wher equired.) 2. Compute the activity rates for the activity cost pools. (Round your answers to 2 decimal places.) 3. Using the activity rates you have computed, determine the total cost and the average cost per thousand square metres of eac the following jobs according to the ABC system: a. A routine 1,000-square-metre asbestos removal job. (Round your answers to 2 decimal places.) b. A routine 2,000-square-metre asbestos removal job. (Round your answers to 2 decimal plac c. A non-routine 1,000-square-metre asbestos removal job. (Round your answers to 2 decimal

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Accounting And Finance For Non Specialists

Authors: Eddie McLaney, Peter Atrill

8th Edition

9780273778165

More Books

Students also viewed these Accounting questions