Waterway Inc. manufactures two products: car wheels and truck wheels. To determine the amount of overhead to assign to each product line, the controller, Robert Hermann, has developed the following information Car Truck 44,000 9,000 Estimated wheels produced Direct labor hours per wheel 1 3 Total estimated overhead costs for the two product lines are $823,600. Calculate overhead rate. (Round answer to 2 decimal places, es 12.25) Overhead rate $ per direct labor hour Compute the overhead cost assigned to the car wheels and truck wheels, assuming that direct labor hours is used to allocate overhead costs Car wheels $ Truck wheels Hermann is not satisfied with the traditional method of allocating overhead because he believes that most of the overhead costs relate to the truck wheels product line because of its complexity. He therefore develops the following three activity cost pools and related cost drivers to better understand these costs. Estimated Use of Cost Drivers Estimated Overhead Costs 1,000 Setups Activity Cost Pools Setting up machines Assembling Inspection $213,000 71.000 labor hours 355,000 1.200 inspections 255,600 Compute the activity-based overhead rates for these three cost pools. Overhead Rates Setting up machines $ Assembling Inspection Compute the cost that is assigned to the car wheels and truck wheels product lines using an activity-based costing system, given the following information Estimated Use of Cost Drivers per Product Car Truck Number of setups Direct labor hours 200 800 44,000 27,000 Number of inspections 100 1.100 Car Wheels Truck Wheels Setting up machines $ $ Assembling $ $ Inspection $ 5 Car Estimated Use of Cost Drivers per Product Truck Number of setups 200 800 Direct labor hours 44,000 27.000 Number of inspections 100 1.100 Car Wheels Truck Wheels Setting up machines $ Assembling $ $ Inspection $ $ Total cost assigned $ $ Save for Later Attempts: 0 of 1 used