Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Overhead Applied to Jobs, Departmental Overhead Rates Watson Products Inc. uses a normal job-order costing system. Currently, a plantwide overhead rate based on machine
Overhead Applied to Jobs, Departmental Overhead Rates Watson Products Inc. uses a normal job-order costing system. Currently, a plantwide overhead rate based on machine hours is used. Marlon Burke, the plant manager, has heard that departmental overhead rates can offer significantly better cost assignments than a plantwide rate can offer. Watson has the following data for its two departments for the coming year: Overhead costs (estimated) Normal activity (machine hours) Required: Department A Department B $2,660,000 140,000 $924,000 84,000 1. Calculate a predetermined overhead rate for the plant as a whole based on machine hours. $ per machine hour 2. Compute predetermined overhead rates for each department using machine hours. (Carry your calculations out to three decimal places.) Department A per machine hour Department B per machine hour 3. Job 73 used 40 machine hours from department A and 60 machine hours from department B. Job 74 used 60 machine hours from department A and 40 machine hours. from department B. Compute the overhead cost assigned to each job using the plantwide rate calculated in Requirement 1. Repeat the computation using the departmental rates found in Requirement 2. Job 73 Job 74 88 Departmental Which of the two approaches gives the fairer assignment? Plantwide Why? The input in the box below will not be graded, but may be reviewed and considered by your instructor. 4. Repeat Requirement 3, assuming the expected overhead cost for department B is $1,596,000 (not $924,000). Plantwide Departmental For Job 73 Job 74 company, ould you recommend departmental rates over a plantwide 5. Conceptual Connection: In most instances, why would a departmental rate be preferable to a plantwide rate? The input in the box below will not be graded, but may be reviewed and considered by your instructor.
Step by Step Solution
★★★★★
3.54 Rating (157 Votes )
There are 3 Steps involved in it
Step: 1
Requirement 1 Total Overhead Cost A Total machine Hours B P...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started