way co d es , m and o r e Problem 17-3 Shaker Co designs and build factory-made premium wooden stairways for homes. The manufactured of white cakwood Budgeted manufacturing overhead costs for the year 2017 are as follows Overhead Coat Pools Purchasing $75,600 Handling materials 82,000 Production using milling, fishing 214,000 Setting machines 101,20 Inspecting 120,000 Inventory control raw materials and finished goods) 141.120 Utilities To buted overhead co $1,134 For the last 4 years, Shaker Stars has been charging overhead to products on the basis of machine hors. For the year 2017, 100,000 machine hours are budgeted Jeremylan, owner manager of SharStars Co, recently directed counte rento implement the c o w that he dy pred Army formandentify the low cost vers and therefore prev e d overdost Cost Drivers Activity Cost Pool Purchasing Handling materials Production in hing! Setting machines Cost Drivers Number of orders Number of moves Duct labor Number of Number of inspection Number of components Square feet Inventory control l ers and finished goods) Steve Hannon as manage has received an order for 250 ways from Community Builders, Inc, large housing devement contractor At Steve's requests prepares cost estimates for producing Steve can submit a contract price per way to community Builders. He w a s the following data for the production of 20 stairways $104,600 Direct materias Direct labor Director hours Number of purchase orders Number of mater Number of concent Number of wuare feet reupled 16.000 3,000 (Round answer to 2 decimal places, .g. 12.25.) Compute the predetermined overhead rate using traditional costing with machine hours as the Predetermined overhead rate per machine hour What is the manufacturing cost per stairway under traditional costing? (Round answer to 2 decimal places, e.g. 12.25.) Cost per stairway Calculate activity based overhead rate for each activity (ound answers to 2 decim Activity Overhead Rate Purchasing per order Handing materials per move Production per DAL hour Setting up machines per setup Inspecting per inspection Inventory control per component Uutis pert Caluciate total overhead assigned under ABC. Total overhead assigned What is the manufacturing cost per stairway under the proposed activity-based costing? (Round answer to 2 decimal places, eg, 12.25.) Total cost per stairways Click If you would like to show Work for this questions Open Show Work