Wayland Containers currently uses a recycled plastic to make bottles for the food industry Click the icon to view the current botte production information) The variabile manufacturing overhead role is based on to estimated variable manufacturing overhead of $300,000 and estimated to direct labor hours (DLH). (Click the icon to view the proposed changes to bottle design and production process.) Read the repigements LH of 10.000. Wayland locales is variable manufacturing overhead based on Requirement 1. Calculate the standard cost perbatch of 10,000 bottles using the current date (MOH) in the standard cost per unit for the company make any changes). Include direct material director and variable maracturing overhead Standard cost per batch Manufacturing cost Direct materials Direct labor Variable MOH Total standard cost Wayland Containers currently uses a recycled plastic to make bottles for the food industry i More Info They direc turing overhead of $300,000 and estimated total DLH of 10,000. Way and allocates its variable Read 0 More Info Reqy (MOH Proposed changes to bottle design and production process: The container division manager is considering having both the bottle redesigned and the bottle production process reengineered so that the plastic usage would drop by 25% overall due both to generating less scrap in the manufacturing process and using less plastic in each bottle. In addition to decreasing the amount of plastic used in producing the bottles, the additional following benefits would be realized: Current bottle production Information: The cost and time standards per batch of 10,000 bottles are as follows: Many Direc Dired Plastic 300 kilograms at $6.00 per kg Direct labor 20 hours at $25.00 per hour Total a. Direct labor hours would be reduced by 20% because less scrap would be handled in the production process b. Total estimated variable manufacturing overhead would be reduced by 10% because less scrap would need to be hauled away, less electricity would be used in the production process, and less inventory would need to be stocked. Print Done Print Done