Weather Instruments assembles products from component parts. It has two departments that process all products. During January the beginning work-in-process in the assembly department was
Weather Instruments assembles products from component parts. It has two departments that process all products. During January the beginning work-in-process in the assembly department was half completed as to conversion and complete as to direct materials. The beginning inventory included $12,000 for materials and $4,000 for conversion costs. Overhead is applied at the rate of 50 percent of direct manufacturing labour costs. Ending work-in-process inventory in the assembly department was 40 percent complete. All spoilage is considered normal and is detected at the end of the process. Additional information about the two departments follows:
Assembly Finishing
Beginning work-in-process units 20,000 24,000
Units started this period 40,000 ?
Units transferred this period 50,000 54,000
Ending work-in-process units 8,000 20,000
Material costs added $44,000 $28,000
Direct manufacturing labour $16,000 $24,000
Required:
Calculate the following for the assembly department assuming that spoilage is recognized, and the weighted-average method is used.
a) Equivalent units of production.
b) Cost per Equivalent unit of production.
c) Cost of Ending Inventory.
d) Cost of units transferred out.
e) Cost of Abnormal Spoilage.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started