What can be the likely risks and constraints to the following Option 3 : Merging two infrastructures and starting the project Cost: $225 million estimated
What can be the likely risks and constraints to the following
Option 3: Merging two infrastructures and starting the project
Cost:$225 million estimated
Benefit:Better utilization of space for 2 facilities.
Risk:Improper designing
Constraint: