Question 1: Review the case study below and answer the five questions. Eddie Turner was elated with the good news that he was being

Question 1: Review the case study below and answer the five questions.

 

Eddie Turner was elated with the good news that he was being promoted to section supervisor in charge of scheduling all activities in the new engineering research laboratory. The new laboratory was a necessity for Mayer Manufacturing. The engineering, manufacturing, and quality control directorates were all in desperate need of a new testing facility. Upper‐level management felt that this new facility would alleviate many of the problems that previously existed.

The new organizational structure (as shown in Figure I) required a change in policy over use of the laboratory. The new section supervisor, on approval from his department manager, would have full authority for establishing priorities for the use of the new facility. The new policy change was a necessity because upper‐level management felt that there would be inevitable conflict among manufacturing, engineering, and quality control.

After one month of operations, Eddie Turner was finding his job impossible, so he has a meeting with Gary Whitehead, his department manager.

Eddie: "I'm having a hell of a time trying to satisfy all of the department managers. If I give engineering prime‐time use of the facility, then quality control and manufacturing say that I'm playing favorites. Imagine that! Even my own people say that I'm playing favorites with other directorates. I just can't satisfy everyone."image text in transcribed

FIGURE I Mayer Manufacturing organizational structure

Gary: "Well, Eddie, you know that this problem comes with the job. You'll get the job done."

Eddie: "The problem is that I'm a section supervisor and have to work with department managers. These department managers look down on me like I'm their servant. If I were a department manager, then they'd show me some respect. What I'm really trying to say is that I would like you to send out the weekly memos to these department managers telling them of the new priorities. They wouldn't argue with you like they do with me. I can supply you with all the necessary information. All you'll have to do is to sign your name."

Gary: "Determining the priorities and scheduling the facilities is your job, not mine. This is a new position and I want you to handle it. I know you can because I selected you. I do not intend to interfere."

During the next two weeks, the conflicts got progressively worse. Eddie felt that he was unable to cope with the situation by himself. The department managers did not respect the authority delegated to him by his superiors. For the next two weeks, Eddie sent memos to Gary in the early part of the week asking whether Gary agreed with the priority list. There was no response to the two memos. Eddie then met with Gary to discuss the deteriorating situation.

Eddie: "Gary, I've sent you two memos to see if I'm doing anything wrong in establishing the weekly priorities and schedules. Did you get my memos?"

Gary: "Yes, I received your memos. But as I told you before, I have enough problems to worry about without doing your job for you. If you can't handle the work, let me know and I'll find someone who can."

Eddie returned to his desk and contemplated his situation. Finally, he made a decision. Next week he was going to put a signature block under his for Gary to sign, with carbon copies for all division managers. "Now let's see what happens," Eddie said.

QUESTIONS

 

1.1 What do you think most likely happened next?

1.2 What could Eddie do next if Gary refused to sign the documents?

1.3 Considering the complexities of stakeholder conflicts, what alternative approaches could Eddie explore to address the challenges in prioritizing and scheduling activities within the engineering research laboratory?

1.4 In light of the ongoing conflicts and Gary's reluctance to intervene, what long-term strategies could Eddie implement to foster a culture of collaboration and stakeholder respect within the organizational structure, ensuring smoother project management in the future?

1.5 How can Eddie proactively mitigate resistance from department managers and build alliances with key stakeholders to ensure a more cooperative approach in aligning priorities and schedules within the new facility?

 

Requirements :

  • Use of proper APA formatting and citations. If supporting evidence from outside resources is used, it must be properly cited. A minimum of 3 - 5 sources from scholarly articles or business periodicals is required.
  • Include your best critical thinking and analysis to arrive at your justification.

Question 2: Answer the below question in 400 words with two peer-reviewed journals.

 

Describe leadership models that better allow for project and team success.

 

Question 3: Describe how leadership models can impact a project outcome. Describe how leadership models can impact a project outcome. What leadership model do you exhibit and how do you feel your leadership style impacts project team dynamics?

 

Requirements:

 

1. The assignment is to answer the above question in essay form. This is to be in narrative form and should be as thorough as possible. Bullet points should not be used. 

2. The paper should be at least 1.5 - 2 pages long, in Times New Roman 12-pt font, double-spaced, with 1-inch margins, and utilize at least five outside scholarly or professional sources. APA formatting and citation should be used.

 

VP Others Engineering Manufacturing Quality Control GARY WHITEHEAD Back to Page EDDIE TURNER DIVISION MANAGERS DEPARTMENT MANAGERS SECTION SUPERVISORS

Step by Step Solution

There are 3 Steps involved in it

Step: 1

Question 11 What do you think most likely happened next The most likely outcome is that when Eddie added Garys signature block to the memos it could escalate tensions between him and Gary By forcing G... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Project Management A Strategic Managerial Approach

Authors: Jack R. Meredith, Scott M. Shafer, Samuel J. Mantel Jr.

11th Edition

1119803837, 978-1119803836

More Books

Students also viewed these General Management questions