What is the AW value for Design B ? What is the PW value for Design B ? A new highway is to be constructed.

image text in transcribed

What is the AW value for Design B ?

What is the PW value for Design B ?

A new highway is to be constructed. Design A calls for a concrete pavement costing $80 per foot with a 20-year life; four paved ditches costing $3 per foot each; and four box culverts every mile, each costing $10,000 and having a 20-year life. Annual maintenance will cost $1,600 per mile; the culverts must be cleaned every five years at a cost of $400 each per mile. Design B calls for a bituminous pavement costing $55 per foot with a 10-year life; four sodded ditches costing $1.40 per foot each; and four pipe culverts every mile, each costing $2,100 and having a 10-year life. The replacement culverts will cost $2,450 each. Annual maintenance will cost $2,600 per mile; the culverts must be cleaned yearly at a cost of $225 each per mile; and the annual ditch maintenance will cost $1.55 per foot per ditch. Compare the two designs on the basis of equivalent worth per mile for a 20-year period. Find the most economical design on the basis of AW and PW if the MARR is 12% per year. Click the icon to view the interest and annuity table for discrete compounding when the MARR is 12% per year. The AW value for Design A is $/mi. (Round to the nearest hundreds.) A new highway is to be constructed. Design A calls for a concrete pavement costing $80 per foot with a 20-year life; four paved ditches costing $3 per foot each; and four box culverts every mile, each costing $10,000 and having a 20-year life. Annual maintenance will cost $1,600 per mile; the culverts must be cleaned every five years at a cost of $400 each per mile. Design B calls for a bituminous pavement costing $55 per foot with a 10-year life; four sodded ditches costing $1.40 per foot each; and four pipe culverts every mile, each costing $2,100 and having a 10-year life. The replacement culverts will cost $2,450 each. Annual maintenance will cost $2,600 per mile; the culverts must be cleaned yearly at a cost of $225 each per mile; and the annual ditch maintenance will cost $1.55 per foot per ditch. Compare the two designs on the basis of equivalent worth per mile for a 20-year period. Find the most economical design on the basis of AW and PW if the MARR is 12% per year. Click the icon to view the interest and annuity table for discrete compounding when the MARR is 12% per year. The AW value for Design A is $/mi. (Round to the nearest hundreds.)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Unlimited Business Financing

Authors: Trent Lee, Dr Chad Lee

1st Edition

1934275050, 9781934275054

More Books

Students also viewed these Finance questions

Question

What factors infl uence our perceptions?

Answered: 1 week ago