Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

What is the objective of the control phase? What are its sub-steps? What is a control plan? What are the important questions that should be

  1. What is the objective of the control phase? What are its sub-steps?
  2. What is a control plan? What are the important questions that should be answered in the control plan?
  3. What is the main difference between an inspection plan and a control plan?
  4. Give an example that shows the difference between the customer's measure of quality and actual specification.
  5. List and briefly describe different types of control plans.
  6. What is the difference between process stability and capability? Include a graph for each one.
  7. List at least five factors that can change a process.
  8. Which probability distribution is the basis of SPC? When do the observations from a process form a curve like a normal distribution (hint: think about presence or absence of assignable causes)?
  9. How many standard deviations are commonly used as the SPC control charts? What percentage of observations should fall within such limits?
  10. When do we say a process is out of statistical control?
  11. What does it mean that a manufacturing process is a random number generator?
  12. What is Kanban used for? Is it used with push or pull production systems?
  13. What is a 2-bin system? How does it work?
  14. Why does Kanban require a high level of quality and product robustness?
  15. What are the two important prerequisites of Kanban? Why?
  16. What is the relationship between Kanban and Poka-Yoke?
  17. In a 2-bin system, how much inventory should be placed in each bin if you want to eliminate extra inventory (hint: think about how much inventory is needed until the empty bin is refilled)?
  18. Which wastes are eliminated using the one-piece flow?

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Project management the managerial process

Authors: Eric W Larson, Clifford F. Gray

5th edition

73403342, 978-0073403342

More Books

Students also viewed these General Management questions

Question

3. Which of the two proposed designs would you recommend, and why?

Answered: 1 week ago