Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

What is the total manufacturing cost assigned to Job A-500? 2B. If Job A-500 consists of 40 units, what is the unit product cost for

What is the total manufacturing cost assigned to Job A-500?

2B. If Job A-500 consists of 40 units, what is the unit product cost for this job?

Fickel Company has two manufacturing departments—Assembly and Testing & Packaging. The predetermined overhead rates in Assembly and Testing & Packaging are $22.00 per direct labor-hour and $18.00 per direct labor-hour, respectively. The company’s direct labor wage rate is $24.00 per hour. The following information pertains to Job N-60:

AssemblyTesting & Packaging
Direct materials$390$45
Direct labor$228$132

Required:

3. What is the total manufacturing cost assigned to Job N-60? (Do not round intermediate calculations.)

3A.. If Job N-60 consists of 10 units, what is the unit product cost for this job? (Do not round intermediate calculations. Round your answer to 2 decimal places.)

Newhard Company assigns overhead cost to jobs on the basis of 119% of direct labor cost. The job cost sheet for Job 313 includes $25,629 in direct materials cost and $10,900 in direct labor cost. A total of 1,500 units were produced in Job 313.

Required:

4a. What is the total manufacturing cost assigned to Job 313?

4b. What is the unit product cost for Job 313?

Item5

10points

eBook

Print

References

Check my workCheck My Work button is now enabled

Item 5

Moody Corporation uses a job-order costing system with a plantwide predetermined overhead rate based on machine-hours. At the beginning of the year, the company made the following estimates:

Machine-hours required to support estimated production159,000
Fixed manufacturing overhead cost$659,000
Variable manufacturing overhead cost per machine-hour$4.10

Required:

5a. Compute the plantwide predetermined overhead rate.

5b. During the year, Job 400 was started and completed. The following information was available with respect to this job:

Direct materials$340
Direct labor cost$280
Machine-hours used31

Compute the total manufacturing cost assigned to Job 400.

5c. If Job 400 includes 50 units, what is the unit product cost for this job?

5d. If Moody uses a markup percentage of 120% of its total manufacturing cost, then what selling price per unit would it have established for Job 400?

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Introduction to Managerial Accounting

Authors: Peter C. Brewer, Ray H Garrison, Eric Noreen

8th edition

1259917061, 978-1259917066

More Books

Students also viewed these Mathematics questions

Question

How do you compute the cost of goods manufactured?

Answered: 1 week ago