What is the total unit cost for the installation of 2 x 14 joist hangers if: 2x14 Joist Hangers Total Material Unit Cost is $176.00
What is the total unit cost for the installation of 2 x 14 joist hangers if: 2x14 Joist Hangers Total Material Unit Cost is $176.00 and Total Labor Unit Cost is $138.00. Group of answer choices 314.00 3.14 301.44 none of the above