Question
For the past year, members at Fox Lake Country Club have been complaining about not being able to access the Internet or slow data transmission
For the past year, members at Fox Lake Country Club have been complaining about not being able to access the Internet or slow data transmission speeds while at the club. Given your knowledge of spreadsheets, Jeff Lewis, business manager at Fox Lake, has asked you to create an Excel template for estimating the cost of rewiring the club’s facilities. Jeff wants the worksheet to contain some basic input information and automatically calculate an estimated price, so that he can quickly estimate the cost of rewiring Fox Lake’s facilities. The variables to be considered are as follows:
- The dimensions of the building to be networked – length in linear feet
- The condition of existing network equipment, where 0 represents none, where 1 represents excellent, 2 represents reasonable but would consider upgrading, and 3 represents poor condition with immediate updates required.
- Whether or not the facility has existing network equipment (YES or NO)
- Speed of network required
Complete the following:
- Open a new workbook and save it as “yourlastname”_CostOfNetwork.xlsx. Create a worksheet with the columns and data shown in the table below (see page 2 for the complete table with column headings). Also, include a meaningful title at the top of your worksheet. Ultimately, this worksheet will be used as a template to evaluate competing bids. List all other inputs that are needed for subsequent calculations below the following table.
Building | Length in feet | Condition of network equipment | Existing Equipment? | Speed of network required? |
Main Clubhouse | 850 | 0 | Yes | 1 Gbs |
Outdoor Patio | 625 | 0 | No | 1 Gbs |
Formal Ballroom | 700 | 1 | Yes | 100 Mbs |
Dining Hall | 500 | 0 | No | 1 Gbs |
Maintenance Shed | 305 | 2 | Yes | 100 Mbs |
Bar and Grill | 330 | 1 | Yes | 1 Gbs |
Men’s Locker Room | 155 | 2 | No | 100 Mbs |
Women’s Locker Room | 125 | 2 | Yes | 100 Mbs |
Outdoor Pool | 760 | 3 | Yes | 1 Gbs |
Fill in the cost per building. Enter all formulas so they can be copied down the column. Remember, your formulas will need to work when new quantities are substituted into the data entry area. Hint: create input cells and reference those cells in your formulas.
- To the right of the Speed of Network Required column, calculate the cost of new network equipment. Only the buildings with an Existing Equipment value of “No” will require networking equipment. The cost is $40.00 per foot. If no networking equipment is required, a value of $0 should be displayed. Title this column “Cost of New Cable.”
- In an adjacent column, calculate the additional cost of networking equipment based on the following criteria:
- If the Condition of Network Equipment is 0 or 3, then computer equipment (e.g. router, backups, etc) are needed at a cost of $5.00 per foot.
- If the Condition of Network Equipment is 2, then computer equipment (e.g. new cables) are needed at a cost of $3.50 per foot.
- Otherwise, no new equipment is needed and a value of $0 should be displayed.
- Title this column “Additional Equipment Cost.”
- In an adjacent column, calculate the cost adjustment for the Condition of the Network Equipment based on the following criteria:
- If the Speed of Network Required is equal to “1 Gbs” and the Condition of the Network Equipment is a 0, then the additional cost of networking is $4.50 per foot, otherwise there is no additional cost and a value of $0 should be displayed.
- Title this column “High-Speed Cost Adjustment.”
- In an adjacent column, calculate the estimated cost to network each building by summing the values resulting from your previous cost calculations (steps 2-4 in the instructions). Title this column “Estimated Cost of Network before Discount.”
- Insert a column to the immediate right of the column titled, “Speed of Network Required?.” Enter a formula that determines if (TRUE, FALSE) this is a high-priced facility. A high-priced facility is one that has an Estimated Cost of Network before Discount greater or equal to $6,000. Title this column “High Priced Facility?.”
- Because larger jobs have certain economies of scale in setup and cleanup, a discount is given based on these estimated values to jobs based on their total size. To the right of “Estimated Cost of Network before Discount,” determine the total discounted price, of the job based on the following:
- If the Estimated Cost of Network before Discount is less than $6,000, then there is no discount.
- If the Estimated Cost of Network before Discount is at least $6,000 but less than $17,000, then a 7% discount will be given (Hint: multiply the discount % times the Estimated Cost of Network before Discount amount, which is Column J).
- If the Estimated Cost of Network before Discount is at least $17,000, then a 10% discount will be given (Hint: multiply the discount % times the Estimated Cost of Network before Discount amount, which is Column J).
- Title this column “Discount.”
- To the right of Discount, calculate the total estimated cost of the network for each building. (Hint: you are subtracting the Discount from the Estimated Cost of Network before Discount). Title this column “Total Estimated Cost of Network.”
- In the row below your calculations, insert a function that counts the number of facilities.
- In the next row, insert a function that counts the number of facilities that received a discount.
- To the right of these two functions enter the text: “Number of Facilities” and “Number of Facilities Receiving a Discount,” respectively.
- Format your worksheet so that it is easy to read and the information is clearly identifiable.
- Be sure to set up your worksheet to include data inputs, so that your results can be changed quickly when an input is altered. For example, if the discount percent changes from 5% to 7%, your results automatically adjust by this change.
Log into Blackboard and Click on Assessments/Lab Assignment 5: Fox Lake Networking. Use your completed spreadsheet to answer the following 10 questions:
1. How many buildings are considered "High Priced?"
2. What is the Cost of New Cable for the Dining Hall?
3. What is the Total Estimated Cost of Network for all buildings combined?
4. What is the total Discount given for all buildings combined?
5. Which building had the highest Additional Equipment Cost?
6. Which building received the largest discount?
7. How many buildings have a Total Estimated Cost of Network = $0.00?
8. Currently, the cost for not having Existing Equipment is $40. What does it need to be for the Total Estimated Cost of Network for all buildings combined to equal $45,000?
9. What would be the Total Estimated Cost of Network for all buildings combined if, in Step 2, the cost for not having network equipment is decreased to $35.00 per foot?
10. With the cost for not having Existing Equipment changed back to $40, what is the total Discount for all buildings combined if the discount % dropped from 10% to 8.5% for all buildings that had an Estimated Cost of Network before Discount >= $17000?
Step by Step Solution
3.54 Rating (168 Votes )
There are 3 Steps involved in it
Step: 1
Answer Answer A1 B C D E F G H I J K L M N O P Q R S T U 2 Renowation of network cost analysis 3 Building Length in feet Condition of network equipment Existing equipment Speed of network required Cos...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started