Question
When President Bob Collins began his career at Wheeled Coach, the world's largest manufacturer of ambulances, there were only a handful of employees. Now the
When President Bob Collins began his career at Wheeled Coach, the world's largest manufacturer of ambulances, there were only a handful of employees. Now the firm's Florida plant has a workforce of 350. The physical plant has also expanded, with offices, R&D, final assembly, and wiring, cabinetry, and upholstery work cells in one large building. Growth has forced the painting work cell into a separate building, aluminum fabrication and body installation into another, inspection and shipping into a fourth, and warehousing into yet another.
Like many other growing companies, Wheeled Coach was not able to design its facility from scratch. And although management realizes that material-handling costs are a little higher than an ideal layout would provide, Collins is pleased with the way the facility has evolved and employees have adapted. The aluminum cutting work cell lies adjacent to body fabrication, which, in turn, is located next to the body-installation work cell. And while the vehicle must be driven across a street to one building for painting and then to another for final assembly, at least the ambulance is on wheels. Collins is also satisfied with the flexibility shown in the design of the work cells. Cell construction is flexible and can accommodate changes in product mix and volume. In addition, work cells are typically small and movable, with many work benches and staging racks borne on wheels so that they can be easily rearranged, and products transported to the assembly line.
Assembly-line balancing is one key problem facing Wheeled Coach and every other repetitive manufacturer. Produced on a schedule calling for four 10-hour work days per week, once an ambulance is on one of the six final assembly lines, it must move forward each day to the next workstation. Balancing just enough workers and tasks at each of the seven workstations is a never-ending challenge. Too many workers end up running into each other; too few can't finish an ambulance in seven days. Constant shifting of design and mix and improved analysis has led to frequent changes.
Heizer, J., Render, B., & Munson, C. (2019). Operations Management: Sustainability and Supply Chain Management (13th ed.). Pearson Education (US). https://online.vitalsource.com/books/9780135202722
Please answer the following
Discuss various analytical techniques available to help a company like Wheeled Coach deal with layout problems and explain the reasons for your choice.
Provide a few concrete suggestions to Bob Collins to improve his layout.
How would you measure the "efficiency" of this layout?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started