Which of the following is NOT a correct statement about cost-estimating methods? A comprehensive unit such as a square foot of floor space is used
Which of the following is NOT a correct statement about cost-estimating methods? A comprehensive unit such as a square foot of floor space is used for conceptual estimates. Preliminary estimates is prepared during feasibility study or when feasibility study is completed. Schematic design documents are used to produce an engineer's estimate. Based on the construction drawing and specification, the contractor prepares a bid estimate of the job's cost to include a markup for profit
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started