@@@@@@@@@@@ will upvote!!! @@@@@@@@@@@@@ An established manufacturer is building a plant in Mexico and they are evaluating various flood control measures as they have seen
@@@@@@@@@@@ will upvote!!! @@@@@@@@@@@@@
An established manufacturer is building a plant in Mexico and they are evaluating various flood control measures as they have seen problems during construction that indicate they will have problems later. They're looking at at 4 options and tight on cash, they are looking at this analysis with an 22 % required return and a 15 year life. Which option would you recommend?
1. Full System - Has large water retention pond, sump pumps, generator for back up power. It will require CAPEX of $2,500,000, and require annual maintenance/testing of $15,000, but prevent damage from a 100 year flood, so we will assume No damage cost.
2. Partial System - Has a medium retention pond and sump pumps, but no back up generator. It will require CAPEX of $1,500,000, and require annual maintenance/OPEX of $10,000. There is a 5% chance (assume annually) that the plant will still have outages/damage from a major storm that could cost $3,500,000.
3. Minor System - Has a medium retention pond and no sump pumps, but no back up generator. It will cost $200,000, and require annual maintenance of $1,000. There is a 10% chance (asssume annually) that the plant will still have outages/damage from a major storm that could cost $3,800,000.
4. No System - There is a 15% chance (asssume annually) that the plant will still have outages/damage from a major storm that could cost $4,500,000.
please show your work!
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started