Question
With the core baseline expectations for the product having been documented, it's now time for the value engineering team to consider new, different ways for
With the core baseline expectations for the product having been documented, it's now time for the value engineering team to consider new, different ways for the product to be developed. This includes trying new approaches, taking risks on things never been done before, or creatively applying existing processes in a new way.
Levering these creative ideas, value engineers will re-imagine how the product will be created and distributed from state to finish. This phase is the "idea-generation" stage where members of the team should be encouraged to brainstorm freely without fear of criticism.
Examples of thinking creatively may include changing the materials used, changing the product's design, removing redundant features, trading off reliability for flexibility, or changing the steps/order of the manufacturing process.
1.calculte the value 2*pi from the period of cos2t+sin3t?
2.how would you relate the Finite quantity as defined to be an energy signal
3.from a Sampling technique,convert a continuous time signal
4.whenis it okay to call a system,the physical device that performs an operation on the signal?
5. Which block is not required in digital processing of a RADAR signal?
6.interconnect the input analog signal to the D/A converter.
7.what is the concept of the parabola. In the input signal be 't'
8.explain the exhibition of the property y(t)=x(1-t)
9.explain the advantageous properties of the analog signal processing?
10. Which parameter is common independent variable for speech signal, EEG and ECG?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started