Question
woodet PLC has two automated machine groups A and B through which timber is pasa order to produce we models of an item of sports
woodet PLC has two automated machine groups A and B through which timber is pasa order to produce we models of an item of sports equipment. The models are cate "raditional" and "High-tech e following forecast information is available for the year to 31 December "Traditional Maximum sales potential (units) Equipment unit data Selling price 6.000 R90 Machine time Group A (hours) 04 Group B (hours) 05 Machine groups A and B have maximum operating hours of 3.400 and 3 840 respectively The sports equipment production is the sole use available for the production capacity High-tech 10 000 R100 0.5 04 quired: The maximum quantity of timber available is 34 000 metres Each product unit requires 4 metres of timber Timber may be purchased in lengths as required at R5 per metre Variable machine overhead cost for machine groups A and B is estimated at R25 and R30 per machine hour All units are sold in the year in which they are produced Using linear programming, Identify the optimal production mix for December
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started