Work Load Capacity Capacity Capacity Center (Std. Hours) (Standard) (Adj. Std.) (Maximum) ALF-A 70 480 336 528 ALF-T 5 80 56 88 HLT-A 438 800
Work Load Capacity Capacity Capacity Center (Std. Hours) (Standard) (Adj. Std.) (Maximum) ALF-A 70 480 336 528 ALF-T 5 80 56 88 HLT-A 438 800 560 880 HLT-T 85 160 112 176 MIS-A 270 800 560 880 MIS-T 14 80 56 88 MVX-A 399 1,120 784 1,232 MVX-T 79 80 56 88 OLD-P 81 0 0 PCB-A 52 160 112 176 PCB-H 44 160 112 176 PCB-1 124 320 224 352 PCB-M 441 480 336 520 PCB-P 408 960 672 1,056 PCB-T 918 1,680 1,176 1,848 PCB-V 123 160 112 176 PCB-W 56 160 112 176 Totals 3,634 7,680 5,376 8,440