Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Workstation Details An overhead continuous conveyor is used to carry dishwasher base parts along a manual assembly line while components are being added to them.
Workstation Details
An overhead continuous conveyor is used to carry dishwasher base parts along a manual assembly line while components are being added to them. Spacing between base parts m and the speed of the conveyor mmin The length of each workstation is m There are a total of stations, four of which have two workers. Three utility workers are also assigned to the line. Determine a tolerance time, b manning level, and c elapsed time a dishwasher base part spends on the line.
Numerical answers only.
a The tolerance time is
minutes.
b The Manning level for the line M is
c The elapsed time a dishwasher base part spends on the line is
minutes,
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started