Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Workstation Details An overhead continuous conveyor is used to carry dishwasher base parts along a manual assembly line while components are being added to them.

Workstation Details
An overhead continuous conveyor is used to carry dishwasher base parts along a manual assembly line while components are being added to them. Spacing between base parts =2.4 m and the speed of the conveyor =1.2 m/min. The length of each workstation is 3.2 m. There are a total of 25 stations, four of which have two workers. Three utility workers are also assigned to the line. Determine (a) tolerance time, (b) manning level, and (c) elapsed time a dishwasher base part spends on the line.
Numerical answers only.
(a) The tolerance time is
minutes.
(b) The Manning level for the line M is
.
(c) The elapsed time a dishwasher base part spends on the line is
minutes,

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Retailing Management

Authors: Michael Levy, Barton A Weitz

8th Edition

0073530026, 9780073530024

More Books

Students also viewed these General Management questions